A fuzzy approach for the earned value management LM Naeni, S Shadrokh, A Salehipour International Journal of Project Management 32 (4), 709-716, 2014 | 239 | 2014 |
Monitoring project duration and cost in a construction project by applying statistical quality control charts R Aliverdi, LM Naeni, A Salehipour International Journal of Project Management 31 (3), 411-423, 2013 | 189 | 2013 |
A fuzzy inference-fuzzy analytic hierarchy process-based clinical decision support system for diagnosis of heart diseases S Nazari, M Fallah, H Kazemipoor, A Salehipour Expert Systems with Applications 95, 261-271, 2018 | 158 | 2018 |
Efficient GRASP+ VND and GRASP+ VNS metaheuristics for the traveling repairman problem A Salehipour, K Sörensen, P Goos, O Bräysy 4OR 9 (2), 189-209, 2011 | 126 | 2011 |
An efficient hybrid meta-heuristic for aircraft landing problem A Salehipour, M Modarres, LM Naeni Computers & Operations Research 40 (1), 207-213, 2013 | 124 | 2013 |
Speeding up the Floyd–Warshall algorithm for the cycled shortest path problem A Aini, A Salehipour Applied Mathematics Letters 25 (1), 1-5, 2012 | 120 | 2012 |
Evaluating fuzzy earned value indices and estimates by applying alpha cuts LM Naeni, A Salehipour Expert systems with Applications 38 (7), 8193-8198, 2011 | 97 | 2011 |
A meta-heuristic to solve the just-in-time job-shop scheduling problem MM Ahmadian, A Salehipour, TCE Cheng European Journal of Operational Research 288 (1), 14-29, 2021 | 92 | 2021 |
Four decades of research on the open-shop scheduling problem to minimize the makespan MM Ahmadian, M Khatami, A Salehipour, TCE Cheng European Journal of Operational Research 295 (2), 399-426, 2021 | 67 | 2021 |
An algorithm for single- and multiple-runway aircraft landing problem A Salehipour Mathematics and Computers in Simulation 175, 179-191, 2020 | 36 | 2020 |
Scheduling aircraft landings by applying a variable neighborhood descent algorithm: Runway-dependent landing time case A Salehipour, LM Naeni, H Kazemipoor Journal of Applied Operational Research 1 (1), 39-49, 2009 | 34 | 2009 |
Makespan minimization for the m-machine ordered flow shop scheduling problem M Khatami, A Salehipour, FJ Hwang Computers & Operations Research 111, 400-414, 2019 | 32 | 2019 |
An efficient GRASP+ VND metaheuristic for the traveling repairman problem A Salehipour, K Sörensen, P Goos, O Bräysy University of Antwerp, Faculty of Applied Economics Working Papers, 2008 | 27 | 2008 |
Coupled task scheduling with exact delays: Literature review and models M Khatami, A Salehipour, TCE Cheng European Journal of Operational Research 282 (1), 19-39, 2020 | 25 | 2020 |
A heuristic algorithm for the aircraft landing problem A Salehipour 22nd International Congress on Modelling and Simulation, Hobart, Tasmania …, 2017 | 23 | 2017 |
Locating workstations in tandem automated guided vehicle systems A Salehipour, H Kazemipoor, L Moslemi Naeini The International Journal of Advanced Manufacturing Technology 52, 321-328, 2011 | 22 | 2011 |
Partitioning machines in tandem AGV systems based on “balanced flow strategy” by simulated annealing R Tavakkoli-Moghaddam, MB Aryanezhad, H Kazemipoor, A Salehipour The International Journal of Advanced Manufacturing Technology 38 (3-4), 355-366, 2008 | 21 | 2008 |
Lessons learned from applying the individuals control charts in monitoring autocorrelated project performance data A Salehipour, LM Naeni, R Khanbabaei, A Javaheri Journal of Construction Engineering and Management, 2015 | 15 | 2015 |
Efficient and simple heuristics for the aircraft landing problem A Salehipour, MM Ahmadian, D Oron Matheuristic 2018 (MH 2018), 18-20 June 2018, Tours., 2018 | 14 | 2018 |
Backtest overfitting in financial markets DH Bailey, J Borwein, M Lopez de Prado, A Salehipour, QJ Zhu Automated Trader, 2016 | 14 | 2016 |