关注
Osama Hussain
Osama Hussain
在 monash.edu 的电子邮件经过验证
标题
引用次数
引用次数
年份
Direct cost of scope creep in governmental construction projects in Qatar
O Hussain
Global Journal of Management and Business Research 12 (14), 73-83, 2012
292012
Minimizing cost overrun in rail projects through 5D-BIM: A systematic literature review
OAI Hussain, RC Moehler, SDC Walsh, DD Ahiaga-Dagbui
Infrastructures 8 (5), 93, 2023
132023
Minimizing Cost Overrun in Rail Projects through 5D-BIM: A Conceptual Governance Framework
OAI Hussain, RC Moehler, SDC Walsh, DD Ahiaga-Dagbui
Buildings 14 (2), 478, 2024
122024
A Conceptual Framework for 5D-BIM Cost Control and Management: A State-of-the-Art Review of Mega Rail Projects in Victoria
OAI Hussain, RC Moehler, SDC Walsh
Computing in Civil Engineering 2023, 613-621, 2024
22024
Minimizing Cost Overrun in Rail Projects Through 5d-Bim: The Case Study of Victoria
OAI Hussain, R Moehler, S Walsh, DD Ahiaga-Dagbui
Available at SSRN 4903299, 2024
12024
Minimizing Cost Overrun in Rail Projects through 5D-BIM
OAI Hussain
Monash University, 2025
2025
系统目前无法执行此操作,请稍后再试。
文章 1–6