关注
Hyounseung Jang
Hyounseung Jang
在 seoultech.ac.kr 的电子邮件经过验证
标题
引用次数
引用次数
年份
Strategies for contractors to sustain growth in the global construction market
SH Han, DY Kim, HS Jang, S Choi
Habitat International 34 (1), 1-10, 2010
1482010
A project manager's level of satisfaction in construction logistics
H Jang, JS Russell, JS Yi
Canadian Journal of Civil Engineering 30 (6), 1133-1142, 2003
862003
Optimization of floor-level construction material layout using genetic algorithms
H Jang, S Lee, S Choi
Automation in construction 16 (4), 531-545, 2007
602007
Correlation between innovation and performance of construction firms
S Choi, H Jang, J Hyun
Canadian Journal of Civil Engineering 36 (11), 1722-1731, 2009
522009
Factors influencing time and cost overruns on freeform construction projects
A Kavuma, J Ock, H Jang
KSCE Journal of Civil Engineering 23, 1442-1450, 2019
482019
Properties of pervious concrete incorporating fly ash as partial replacement of cement: A review
E Khankhaje, T Kim, H Jang, CS Kim, J Kim, M Rafieizonooz
Developments in the Built Environment 14, 100130, 2023
452023
An international competitiveness evaluation model in the global construction industry
J Han, H Park, J Ock, H Jang
KSCE Journal of Civil Engineering 19, 465-477, 2015
282015
Client values within post-disaster reconstruction contracting services
S Aliakbarlou, S Wilkinson, SB Costello, H Jang
Disaster Prevention and Management: An International Journal 26 (3), 348-360, 2017
232017
Strategic selection of green construction products
HS Jang, SI Choi, WY Kim, CK Chang
KSCE Journal of Civil Engineering 16, 1115-1122, 2012
232012
Achieving postdisaster reconstruction success based on satisfactory delivery of client values within contractors’ services
S Aliakbarlou, S Wilkinson, SB Costello, H Jang
Journal of Management in Engineering 34 (2), 04017058, 2018
192018
Quantified benefit of implementing enterprise resource planning through process simulation
S Lee, AU Arif, H Jang
Canadian Journal of Civil Engineering 31 (2), 263-271, 2004
192004
Analysis of competency assessment using IPA for construction project managers
HR Kim, NK Lee, HS Jang
Korean Journal of Construction Engineering and Management 14 (1), 115-123, 2013
172013
A study on development of the competitive evaluation model in oversea construction industry
JG Han, H Park, HS Jang
Korean Journal of Construction Engineering and Management 14 (2), 12-21, 2013
172013
Conceptual client value index for post disaster reconstruction contracting services
S Aliakbarlou, S Wilkinson, SB Costello, H Jang
KSCE Journal of Civil Engineering 22, 1067-1076, 2018
162018
건설공사의 자동화ㆍ기계화의 효과 및 확대 방안
장현승, 우성권
한국건설산업연구원 건설동향브리핑 2003 (1), 2-15, 2003
152003
Comparative analysis of strategic planning in construction firms
CS Park, HS Jang, SI Choi, HC Cho
Journal of Asian Architecture and Building Engineering 9 (1), 25-30, 2010
132010
Genetic algorithm for construction space management
HS Jang
KSCE Journal of Civil Engineering 8, 365-369, 2004
132004
Competency assessment of korean construction firms on international plant projects
HS Jang, BN Lee, SI Choi, BS Koo
Korean Journal of Construction Engineering and Management 9 (4), 173-181, 2008
112008
Strengths, weaknesses, opportunities, and threats analysis of Korea construction companies in the Vietnam market
H Kim, HS Jang
Journal of the architectural institute of Korea Structure & Construction 31 …, 2015
102015
세계 건설시장 동향 및 2008 년 해외건설 수주 전망
이복남, 장현승
한국건설산업연구원 건설동향브리핑 2008 (2), 1-22, 2008
102008
系统目前无法执行此操作,请稍后再试。
文章 1–20