关注
Yuanxin Zhang
Yuanxin Zhang
Guangzhou University
在 ufl.edu 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Practical issues in implementing machine-learning models for building energy efficiency: Moving beyond obstacles
Z Wang, J Liu, Y Zhang, H Yuan, R Zhang, RS Srinivasan
Renewable and Sustainable Energy Reviews 143, 110929, 2021
952021
Exploring the Emerging Evolution Trends of Urban Resilience Research by Scientometric Analysis
W Liang, X Xiaolong, Z Yuanxin, L Xiaowei
International Journal of Environmental Research and Public Health 15 (10), 2181, 2018
592018
Exploring a body of knowledge for promoting the sustainable transition to prefabricated construction
T Luo, X Xue, Y Tan, Y Wang, Y Zhang
Engineering, Construction and Architectural Management 28 (9), 2637-2666, 2021
402021
Collaborative innovation for sustainable construction: The case of an industrial construction project network
R Zhang, Z Wang, Y Tang, Y Zhang
Ieee Access 8, 41403-41417, 2020
362020
Forecasting Completed Cost of Highway Construction Projects Using LASSO Regularized Regression
Z Yuanxin, A R. Edward, Minchin, Duzgun
Journal of Construction Engineering and Management, 2017
342017
Collaborative relationship discovery in green building technology innovation: Evidence from patents in China's construction industry
R Zhang, Y Tang, Y Zhang, Z Wang
Journal of Cleaner Production 391, 136041, 2023
302023
Industry Attitudes Toward Alternative Contracting for Highway Construction in Florida
Journal of Management in Engineering, 2017
25*2017
Framework for a blockchain-based infrastructure project financing system
Y Zhang, Z Wang, J Deng, Z Gong, I Flood, Y Wang
IEEE access 9, 141555-141570, 2021
232021
Using cloud-based augmented reality to 3D-enable the 2D drawings of AISC steel sculpture: a plan-reading educational experiment
J Wen, M Gheisari, S Jain, Y Zhang, RE Minchin
Journal of Civil Engineering Education 147 (3), 04021006, 2021
232021
An innovative infrastructure financing instrument: Blockchain-based tokenization
Y Tian, Y Zhang, RE Minchin, A Asutosh, C Kan
Construction Research Congress 2020, 731-740, 2020
172020
Tracking the research on ten emerging digital technologies in the AECO industry
Y Dou, T Li, L Li, Y Zhang, Z Li
Journal of Construction Engineering and Management 149 (3), 03123003, 2023
142023
Alternative contracting research
RE Minchin Jr, AR Chini, L Ptschelinzew, D Shah, Y Zhang, ME Rinker Sr
Florida Department of Transportation, 2016
132016
Qualitative assessment of indirect risks associated with Unmanned Aerial Vehicle flights over construction job sites
HI Moud, I Flood, A Shojaei, Y Zhang, X Zhang, M Tadayon, M Hatami
ASCE International Conference on Computing in Civil Engineering 2019, 83-89, 2019
122019
Performance of Seven Highway Construction Contracting Methods Analyzed by Project Size
Y Zhang, A Chini, RE Minchin Jr, L Ptschelinzew, D Shah
Frontiers of Engineering Management 5 (2), 240-250, 2018
102018
A cost model to evaluate the economic performance of contour crafting
X Zhang, I Flood, Y Zhang, HI Moud, M Hatami
ASCE International Conference on Computing in Civil Engineering 2019, 618-625, 2019
92019
Qualitative and quantitative risk analysis of unmanned aerial vehicle flights on construction job sites: A case study
HI Moud, X Zhang, I Flood, A Shojaei, Y Zhang, C Capano
Int. J. Adv. Intell. Syst 12 (3), 135-146, 2019
92019
The cascade effect of collaborative innovation in infrastructure project networks
R Zhang, X Xue, Y Zhang
Journal of Civil Engineering and Management 27 (3), 175-187, 2021
82021
Planning and scheduling prefabrication construction projects using dependency structure matrix (DSM)
Y Zhang, I Flood
Computing in Civil and Building Engineering (2014), 1457-1464, 2014
82014
Relationship management strategies for identifying party discord and misperceptions
L Ptschelinzew, RE Minchin Jr, A Chini, Y Zhang
Journal of legal affairs and dispute resolution in engineering and …, 2020
72020
Evaluation of construction industrialization policy based on PMC index model
Y Zhang, Y Jin, X Xue
International Conference on Construction and Real Estate Management 2018 …, 2018
72018
系统目前无法执行此操作,请稍后再试。
文章 1–20