关注
Yao Youjie
Yao Youjie
在 mail.hust.edu.cn 的电子邮件经过验证
标题
引用次数
引用次数
年份
A novel MILP model for job shop scheduling problem with mobile robots
YJ Yao, QH Liu, XY Li, L Gao
Robotics and Computer-Integrated Manufacturing 81, 102506, 2023
382023
A novel mathematical model for the flexible job-shop scheduling problem with limited automated guided vehicles
Y Yao, Q Liu, L Fu, X Li, Y Yu, L Gao, W Zhou
IEEE Transactions on Automation Science and Engineering, 2024
172024
A DQN-based memetic algorithm for energy-efficient job shop scheduling problem with integrated limited AGVs
Y Yao, X Li, L Gao
Swarm and Evolutionary Computation 87, 101544, 2024
122024
Tabu search based on novel neighborhood structures for solving job shop scheduling problem integrating finite transportation resources
Y Yao, L Gui, X Li, L Gao
Robotics and Computer-Integrated Manufacturing 89, 102782, 2024
42024
Knowledge-based multi-objective evolutionary algorithm for energy-efficient flexible job shop scheduling with mobile robot transportation
Y Yao, Q Wang, C Wang, X Li, L Gao, K Xia
Advanced Engineering Informatics 62, 102647, 2024
42024
A Knowledge-Driven Hybrid Algorithm for Solving the Integrated Production and Transportation Scheduling Problem in Job Shop
Y Yao, C Wang, X Li, L Gao
IEEE Transactions on Intelligent Transportation Systems, 2024
12024
An Adaptive Discrete Whale Swarm Algorithm for the Distributed Job-Shop Scheduling Problem with Limited AGVs
Y Yao, C Wang, Y Gao, X Li, L Gao
2023 IEEE 19th International Conference on Automation Science and …, 2023
12023
A hybrid algorithm considering continuous transportation for flexible job shop scheduling problem with finite transportation resources
Q Wang, L Gao, Y Yu, Z Xiang, Y Yao, X Li, W Zhou
Neural Computing and Applications, 1-21, 2024
2024
系统目前无法执行此操作,请稍后再试。
文章 1–8