The foundations of lean construction L Koskela, G Howell, G Ballard, I Tommelein Design and construction, 211-226, 2007 | 628 | 2007 |
Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique ID Tommelein Journal of construction engineering and management 124 (4), 279-288, 1998 | 490 | 1998 |
Parade game: Impact of work flow variability on trade performance ID Tommelein, DR Riley, GA Howell Journal of construction engineering and management 125 (5), 304-310, 1999 | 440 | 1999 |
Value stream analysis of a re-engineered construction supply chain R Arbulu, I Tommelein, K Walsh, J Hershauer Building Research & Information 31 (2), 161-171, 2003 | 273 | 2003 |
Understanding project success through analysis of project management approach A Rolstadås, I Tommelein, P Morten Schiefloe, G Ballard International journal of managing projects in business 7 (4), 638-660, 2014 | 255 | 2014 |
2020 Current process benchmark for the last planner (R) system of project planning and control G Ballard, I Tommelein | 252 | 2021 |
Dynamic layout planning using a hybrid incremental solution method PP Zouein, ID Tommelein Journal of construction engineering and management 125 (6), 400-408, 1999 | 219 | 1999 |
Takt time planning for construction of exterior cladding A Frandson, K Berghede, ID Tommelein 21st Annual Conference of the International Group for Lean Construction …, 2013 | 218 | 2013 |
Just-in-time concrete delivery: mapping alternatives for vertical supply chain integration ID Tommelein, A Li Proceedings iglc 7, 97, 1999 | 214 | 1999 |
Interactive dynamic layout planning ID Tommelein, PP Zouein Journal of construction engineering and management 119 (2), 266-287, 1993 | 202 | 1993 |
Lean construction tools and techniques G Ballard, I Tommelein, L Koskela, G Howell Design and construction, 227-255, 2007 | 201 | 2007 |
WorkPlan: Constraint-based database for work package scheduling HJ Choo, ID Tommelein, G Ballard, TR Zabelle Journal of Construction Engineering and Management 125 (3), 151-160, 1999 | 186 | 1999 |
Rethinking Lookahead Planning to Optimize Construction Workflow. F Hamzeh, G Ballard, ID Tommelein Lean construction journal, 2012 | 181 | 2012 |
Coordinating specialists ID Tommelein, G Ballard | 142 | 1997 |
SightPlan experiments: Alternate strategies for site layout design ID Tommelein, RE Levitt, B Hayes-Roth, T Confrey Journal of computing in civil engineering 5 (1), 42-63, 1991 | 141 | 1991 |
Comparing AHP and CBA as decision methods to resolve the choosing problem in detailed design P Arroyo, ID Tommelein, G Ballard Journal of construction engineering and management 141 (1), 04014063, 2015 | 135 | 2015 |
Is the Last Planner System applicable to design? A case study FR Hamzeh, G Ballard, ID Tommelein Proceedings of the 17th Annual Conference of the International Group for …, 2009 | 135 | 2009 |
Lean management methods for complex projects G Ballard, I Tommelein Engineering project organization journal 2 (1-2), 85-96, 2012 | 133 | 2012 |
DePlan: a tool for integrated design management HJ Choo, J Hammond, ID Tommelein, SA Austin, G Ballard Automation in Construction 13 (3), 313-326, 2004 | 133 | 2004 |
SightPlan model for site layout ID Tommelein, RE Levitt, B Hayes-Roth Journal of construction engineering and management 118 (4), 749-766, 1992 | 127 | 1992 |