Developing a new fuzzy inference system for pipeline risk assessment A Jamshidi, A Yazdani-Chamzini, SH Yakhchali, S Khaleghi Journal of loss prevention in the process industries 26 (1), 197-208, 2013 | 245 | 2013 |
Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods A Yazdani-Chamzini, SH Yakhchali Tunnelling and Underground Space Technology 30, 194-204, 2012 | 186 | 2012 |
Forecasting gold price changes by using adaptive network fuzzy inference system A Yazdani-Chamzini, SH Yakhchali, D Volungevičienė, EK Zavadskas Journal of Business Economics and Management 13 (5), 994-1010, 2012 | 78 | 2012 |
A novel fuzzy inference system for predicting roof fall rate in underground coal mines M Razani, A Yazdani-Chamzini, SH Yakhchali Safety science 55, 26-33, 2013 | 76 | 2013 |
Computing latest starting times of activities in interval-valued networks with minimal time lags SH Yakhchali, SH Ghodsypour European Journal of Operational Research 200 (3), 874-880, 2010 | 64 | 2010 |
Proposing a neural network model to predict time and cost claims in construction projects V Yousefi, SH Yakhchali, M Khanzadi, E Mehrabanfar, J Šaparauskas Journal of Civil Engineering and Management 22 (7), 967-978, 2016 | 57 | 2016 |
Developing a fuzzy model based on subtractive clustering for road header performance prediction A Yazdani-Chamzini, M Razani, SH Yakhchali, EK Zavadskas, Z Turskis Automation in Construction 35, 111-120, 2013 | 57 | 2013 |
Risk ranking of tunnel construction projects by using the ELECTRE technique under a fuzzy environment A Yazdani-Chamzini, SH Yakhchali, M Mahmoodian International Journal of Management Science and Engineering Management 8 (1 …, 2013 | 47 | 2013 |
PROJECT PORTFOLIO SELECTION USING FUZZY AHP AND VIKOR TECHNIQUES. MM Fouladgar, A Yazdani-Chamzini, EK Zavadskas, SH Yakhchali, ... Transformations in Business & Economics 11 (1), 2012 | 38 | 2012 |
Combining Monte Carlo simulation and Bayesian networks methods for assessing completion time of projects under risk A Namazian, SH Yakhchali, V Yousefi, J Tamošaitienė International Journal of Environmental Research and Public Health 16 (24), 5024, 2019 | 36 | 2019 |
Modified Bayesian network–based risk analysis of construction projects: Case study of South Pars gas field development projects A Namazian, S Haji Yakhchali ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A …, 2018 | 35 | 2018 |
Proposing a new methodology for prioritising the investment strategies in the private sector of Iran A Yazdani-Chamzini, S Shariati, SH Yakhchali, E Kazimieras Zavadskas Economic research-Ekonomska istraživanja 27 (1), 320-345, 2014 | 34 | 2014 |
A new model to predict roadheader performance using rock mass properties YC Abdolreza, HY Siamak Journal of Coal Science and Engineering (China) 19, 51-56, 2013 | 29 | 2013 |
The impact made on project portfolio optimisation by the selection of various risk measures V Yousefi, SH Yakhchali, J Šaparauskas, S Kiani KTU, 2018 | 25 | 2018 |
Stochastic data-driven optimization for multi-class dynamic pricing and capacity allocation in the passenger railroad transportation K Kamandanipour, MM Nasiri, D Konur, SH Yakhchali Expert Systems with Applications 158, 113568, 2020 | 24 | 2020 |
A path enumeration approach for the analysis of critical activities in fuzzy networks SH Yakhchali Information Sciences 204, 23-35, 2012 | 24 | 2012 |
A hybrid genetic algorithm for computing the float of an activity in networks with imprecise durations SH Yakhchali, SH Ghodsypour 2008 IEEE International Conference on Fuzzy Systems (IEEE World Congress on …, 2008 | 24 | 2008 |
Net present value maximisation of integrated project scheduling and material procurement planning BH Tabrizi, SF Ghaderi, S Haji-Yakhchali International Journal of Operational Research 34 (2), 285-300, 2019 | 19 | 2019 |
Modeling and solving project portfolio and contractor selection problem based on project scheduling under uncertainty A Namazian, SH Yakhchali Procedia-Social and Behavioral Sciences 226, 35-42, 2016 | 19 | 2016 |
On the latest starting times and criticality of activities in a network with imprecise durations SH Yakhchali, SH Ghodsypour Applied Mathematical Modelling 34 (8), 2044-2058, 2010 | 19 | 2010 |