关注
Siamak Haji Yakhchali
Siamak Haji Yakhchali
其他姓名Siamak H. Yakhchali, S. H. Yakhchali
在 ut.ac.ir 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Developing a new fuzzy inference system for pipeline risk assessment
A Jamshidi, A Yazdani-Chamzini, SH Yakhchali, S Khaleghi
Journal of loss prevention in the process industries 26 (1), 197-208, 2013
2452013
Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods
A Yazdani-Chamzini, SH Yakhchali
Tunnelling and Underground Space Technology 30, 194-204, 2012
1862012
Forecasting gold price changes by using adaptive network fuzzy inference system
A Yazdani-Chamzini, SH Yakhchali, D Volungevičienė, EK Zavadskas
Journal of Business Economics and Management 13 (5), 994-1010, 2012
782012
A novel fuzzy inference system for predicting roof fall rate in underground coal mines
M Razani, A Yazdani-Chamzini, SH Yakhchali
Safety science 55, 26-33, 2013
762013
Computing latest starting times of activities in interval-valued networks with minimal time lags
SH Yakhchali, SH Ghodsypour
European Journal of Operational Research 200 (3), 874-880, 2010
642010
Proposing a neural network model to predict time and cost claims in construction projects
V Yousefi, SH Yakhchali, M Khanzadi, E Mehrabanfar, J Šaparauskas
Journal of Civil Engineering and Management 22 (7), 967-978, 2016
572016
Developing a fuzzy model based on subtractive clustering for road header performance prediction
A Yazdani-Chamzini, M Razani, SH Yakhchali, EK Zavadskas, Z Turskis
Automation in Construction 35, 111-120, 2013
572013
Risk ranking of tunnel construction projects by using the ELECTRE technique under a fuzzy environment
A Yazdani-Chamzini, SH Yakhchali, M Mahmoodian
International Journal of Management Science and Engineering Management 8 (1 …, 2013
472013
PROJECT PORTFOLIO SELECTION USING FUZZY AHP AND VIKOR TECHNIQUES.
MM Fouladgar, A Yazdani-Chamzini, EK Zavadskas, SH Yakhchali, ...
Transformations in Business & Economics 11 (1), 2012
382012
Combining Monte Carlo simulation and Bayesian networks methods for assessing completion time of projects under risk
A Namazian, SH Yakhchali, V Yousefi, J Tamošaitienė
International Journal of Environmental Research and Public Health 16 (24), 5024, 2019
362019
Modified Bayesian network–based risk analysis of construction projects: Case study of South Pars gas field development projects
A Namazian, S Haji Yakhchali
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A …, 2018
352018
Proposing a new methodology for prioritising the investment strategies in the private sector of Iran
A Yazdani-Chamzini, S Shariati, SH Yakhchali, E Kazimieras Zavadskas
Economic research-Ekonomska istraživanja 27 (1), 320-345, 2014
342014
A new model to predict roadheader performance using rock mass properties
YC Abdolreza, HY Siamak
Journal of Coal Science and Engineering (China) 19, 51-56, 2013
292013
The impact made on project portfolio optimisation by the selection of various risk measures
V Yousefi, SH Yakhchali, J Šaparauskas, S Kiani
KTU, 2018
252018
Stochastic data-driven optimization for multi-class dynamic pricing and capacity allocation in the passenger railroad transportation
K Kamandanipour, MM Nasiri, D Konur, SH Yakhchali
Expert Systems with Applications 158, 113568, 2020
242020
A path enumeration approach for the analysis of critical activities in fuzzy networks
SH Yakhchali
Information Sciences 204, 23-35, 2012
242012
A hybrid genetic algorithm for computing the float of an activity in networks with imprecise durations
SH Yakhchali, SH Ghodsypour
2008 IEEE International Conference on Fuzzy Systems (IEEE World Congress on …, 2008
242008
Net present value maximisation of integrated project scheduling and material procurement planning
BH Tabrizi, SF Ghaderi, S Haji-Yakhchali
International Journal of Operational Research 34 (2), 285-300, 2019
192019
Modeling and solving project portfolio and contractor selection problem based on project scheduling under uncertainty
A Namazian, SH Yakhchali
Procedia-Social and Behavioral Sciences 226, 35-42, 2016
192016
On the latest starting times and criticality of activities in a network with imprecise durations
SH Yakhchali, SH Ghodsypour
Applied Mathematical Modelling 34 (8), 2044-2058, 2010
192010
系统目前无法执行此操作,请稍后再试。
文章 1–20