An overview of continuous improvement: from the past to the present N Bhuiyan, A Baghel Management decision 43 (5), 761-771, 2005 | 1213 | 2005 |
A framework for successful new product development N Bhuiyan Journal of Industrial Engineering and Management (JIEM) 4 (4), 746-770, 2011 | 414 | 2011 |
An investigation into issues related to the latest version of ISO 9000 N Bhuiyan, N Alam Total quality management and business excellence 16 (2), 199-213, 2005 | 226 | 2005 |
A sustainable continuous improvement methodology at an aerospace company N Bhuiyan, A Baghel, J Wilson International Journal of Productivity and Performance Management 55 (8), 671-687, 2006 | 200 | 2006 |
Entropy as a measure of operational flexibility E Shuiabi, V Thomson, N Bhuiyan European journal of operational research 165 (3), 696-707, 2005 | 158 | 2005 |
Simulation of the new product development process for performance improvement N Bhuiyan, D Gerwin, V Thomson Management science 50 (12), 1690-1703, 2004 | 137 | 2004 |
ISO 9001: 2000 implementation–the North American experience N Bhuiyan, N Alam International Journal of Productivity and Performance Management 53 (1), 10-17, 2004 | 129 | 2004 |
Integrating workers’ differences into workforce planning M Othman, N Bhuiyan, GJ Gouw Computers & Industrial Engineering 63 (4), 1096-1106, 2012 | 78 | 2012 |
Industry 4.0 and demand forecasting of the energy supply chain: A literature review AR Nia, A Awasthi, N Bhuiyan Computers & Industrial Engineering 154, 107128, 2021 | 77 | 2021 |
A case study of a quality system implementation in a small manufacturing firm N Bhuiyan, N Alam International Journal of Productivity and Performance Management 54 (3), 172-186, 2005 | 73 | 2005 |
Implementing concurrent engineering N Bhuiyan, V Thomson, D Gerwin Research-Technology Management 49 (1), 38-43, 2006 | 55 | 2006 |
Determining supply chain safety stock level and location B Amirjabbari, N Bhuiyan Journal of Industrial Engineering and Management (JIEM) 7 (1), 42-71, 2014 | 44 | 2014 |
Continuous improvement of injection moulding using Six Sigma: case study A Maged, S Haridy, S Kaytbay, N Bhuiyan International Journal of Industrial and Systems Engineering 32 (2), 243-266, 2019 | 43 | 2019 |
Workforce scheduling: A new model incorporating human factors M Othman, GJ Gouw, N Bhuiyan Journal of Industrial Engineering and Management (JIEM) 5 (2), 259-284, 2012 | 42 | 2012 |
A new model of sustainable product development process for making trade-offs M Salari, N Bhuiyan The International Journal of Advanced Manufacturing Technology 94, 1-11, 2018 | 39 | 2018 |
An eco-friendly aircraft taxiing approach with collision and conflict avoidance M Soltani, S Ahmadi, A Akgunduz, N Bhuiyan Transportation Research Part C: Emerging Technologies 121, 102872, 2020 | 32 | 2020 |
Manufacturing in blow molding: Time reduction and part quality improvement A Attar, N Bhuiyan, V Thomson Journal of materials processing technology 204 (1-3), 284-289, 2008 | 27 | 2008 |
Toward implementing patient flow in a cancer treatment center to reduce patient waiting time and improve efficiency S Suss, N Bhuiyan, K Demirli, G Batist Journal of oncology practice 13 (6), e530-e537, 2017 | 26 | 2017 |
Optimal average sample number of the SPRT chart for monitoring fraction nonconforming S Haridy, Z Wu, KM Lee, N Bhuiyan European Journal of Operational Research 229 (2), 411-421, 2013 | 26 | 2013 |
A framework for NPD processes under uncertainty N Bhuiyan, V Thomson Engineering Management Journal 22 (2), 27-35, 2010 | 26 | 2010 |