关注
Shichang Xiao
标题
引用次数
引用次数
年份
Anti-conflict AGV path planning in automated container terminals based on multi-agent reinforcement learning
H Hu, X Yang, S Xiao, F Wang
International Journal of Production Research 61 (1), 65-80, 2023
762023
Risk measure of job shop scheduling with random machine breakdowns
Z Wu, S Sun, S Xiao
Computers & operations research 99, 1-12, 2018
332018
Surrogate measures for the robust scheduling of stochastic job shop scheduling problems
S Xiao, S Sun, J Jin
Energies 10 (4), 543, 2017
162017
Post disaster adaptation management in airport: A coordination of runway and hangar resources for relief cargo transports
Y Qin, KKH Ng, H Hu, FTS Chan, S Xiao
Advanced Engineering Informatics 50, 101403, 2021
132021
Research on the dual-resource constrained robust job shop scheduling problems
肖世昌, 吴自高, 孙树栋, 金梅
Journal of Mechanical Engineering 57 (4), 227-239, 2021
102021
A two-stage assignment strategy for the robust scheduling of dual-resource constrained stochastic job shop scheduling problems
S Xiao, Z Wu, S Yu
IFAC-PapersOnLine 52 (13), 421-426, 2019
102019
双资源约束的鲁棒 Job Shop 调度问题研究
肖世昌, 吴自高, 孙树栋, 金梅
机械工程学报 57 (4), 227-239, 2021
72021
混合分布估计算法求解随机 Job shop 提前/拖期调度问题
肖世昌, 孙树栋, 杨宏安
控制与决策 10, 1854-1860, 2015
52015
Rolling Bearing Fault Feature Extraction Using Local Maximum Synchro-squeezing Transform and Global Fuzzy Entropy
K Zhu, X Yue, D Sun, S Xiao, X Hu
Int. J. Acoust. Vib 27, 37-44, 2022
42022
加工时间随机可控 Job Shop 前摄调度研究
肖世昌, 孙树栋, 杨宏安
西北工业大学学报 32 (6), 929-936, 2014
32014
Proactive scheduling research on job shop with stochastically controllable processing times
SC Xiao, SD Sun, HA Yang
J. Northwest. Polytech. Univ 52, 929-936, 2014
32014
灾变遗传算法求解带时间窗的车辆调度问题
肖世昌, 孙树栋, 国欢
计算机应用研究 31 (12), 3568-3571, 2014
32014
Resilience-Based Surrogate Robustness Measure and Optimization Method for Robust Job-Shop Scheduling
S Xiao, Z Wu, H Dui
Mathematics 10 (21), 4048, 2022
22022
求解随机 Job Shop 调度问题的混合分布估计算法
肖世昌, 孙树栋, 国欢, 金梅, 杨宏安
机械工程学报 51 (20), 27-35, 2015
22015
Cataclysm genetic algorithm for solving vechicle scheduling problem with time windows.
X Shi-chang, SUN Shu-dong, GUO Huan
Application Research of Computers/Jisuanji Yingyong Yanjiu 31 (12), 2014
22014
Predictive-reactive scheduling for Job-Shop with material shortage.
LI Duo, SUN Shu-dong, X Shi-chang
Application Research of Computers/Jisuanji Yingyong Yanjiu 31 (5), 2014
22014
材料供应短缺情况下 Job-Shop 预测—反应式调度
李多, 孙树栋, 肖世昌
计算机应用研究 31 (5), 1418-1423, 2014
22014
用于网版印刷自动套印的十字线检测新方法
肖世昌, 成刚虎, 国强
中国印刷与包装研究 4 (2), 35-41, 2012
12012
平型丝网印刷机单机自动套准系统研究
肖世昌, 成刚虎, 蒋艳丽
中国印刷与包装研究, 57-61, 2011
12011
A Hybrid Adaptive Simulated Annealing and Tempering Algorithm for Solving the Half-Open Multi-Depot Vehicle Routing Problem
S Xiao, P Peng, P Zheng, Z Wu
Mathematics 12 (7), 947, 2024
2024
系统目前无法执行此操作,请稍后再试。
文章 1–20