关注
Ayman Hamdy Nassar
Ayman Hamdy Nassar
Associate Professor at German University in Cairo
在 guc.edu.eg 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Machine Learning Algorithms for Construction Projects Delay Risk Prediction
A Gondia, A Siam, W El-Dakhakhni, AH Nassar
Journal of Construction Engineering and Management, ASCE 146 (1), 2020
2392020
The effect of building information modeling (BIM) on construction claims
A El Hawary, A Nassar
Int. J. Sci. Technol. Res 5 (12), 25-33, 2015
292015
The Effect of Risk Allocation on Minimizing Disputes in Construction Projects in Egypt
R yasser, AH Nassar
German University in Cairo (GUC), Faculty of Engineering, 2016
112016
Investigating the impact of changing the usage type of existing structure using BIM
HM Mahmoud, AA Fayad, AH Nassar
Civ. Eng. J 8 (8), 1606-1621, 2022
82022
Using multi-criteria decision making (MCDM) methods in Egyptian construction projects
R Ahmed, M Afifi, A Nassar
Canadian Society for Civil Engineering Annual Conference, 2019
62019
Delay Analysis Statements in Presence of Debatable Concerns in Construction Projects
A Wasfy, AH Nassar
IEEE Engineering Management Review 49 (4), 123-135, 2021
42021
Causes and Effects of Delay in the Construction Industry in Egypt
AH Nassar
International Journal of Engineering Research & Technology (IJERT), 2016
42016
CLAIMS AND DISPUTES RESOLUTION USING BIM TECHNOLOGY AND VDC PROCESS IN CONSTRUCTION CONTRACT RISK ANALYSIS
AMA Abd-Ellatif, AH Nassar
International Journal of Civil Engineering and Technology 12 (4), 82-107, 2021
32021
Using Support Vector Machine (SVM) for Time and Cost Overrun Analysis in Construction Projects in Egypt
AHN Mohamed Gamal Eltoukhy
International Journal of Civil Engineering and Technology (IJCIET) 12 (3), 5-22, 2021
3*2021
Using Artificial Neural Networks to Model Cost Overruns in Real Estate Projects
AHN Kareem Mohammad Mahmoud Mostafa
International Journal of Research and Scientific Innovation (IJRSI) 5 (X), 72-86, 2018
3*2018
Cost Analysis for Irrigation Projects Using Solar Energy in Egypt
AW Soliman, AH Nassar, AM Sattar
32018
Introduction to Project Management Using Critical Path Method (CPM)
AH Nassar
32018
Comparing suitability of NEC and FIDIC contracts in managing construction project in Egypt
AH Nassar, ND Rasslan
International Journal of Engineering Research & Technology (IJERT) 6 (6 …, 2017
32017
Improving Project Management At the Design Phase By Applying Lean Six Sigma as a Troubleshooting System
T Sakr, AH Nassar
IEEE Engineering Management Review, 1-14, 2022
22022
Integrated Model for Selecting the Best-Value Contractor in Construction Projects in Egypt
MS Shehata, AH Nassar
International Journal of Research in Engineering and Technology 7 (01), 2018
22018
Delay analysis methods and statements in construction projects
AHN Abanoub Wasfy
International Journal of Project Organisation and Management 14 (4), 431 - 451, 2022
12022
ENGINEERING & MANAGEMENT
TCE Cheng, PWC Choy, SW Wong, M Wolf, A Ketenci, A Weyand, ...
China Communications 1, 2021
12021
RISK ALLOCATION FRAMEWORK TO MINIMIZE DISPUTES IN CONSTRUCTION PROJECTS: CASE STUDY OF EGYPT
R Ahmed, A Nassar
12018
Evaluation of Factors Leading to Time Delays and Cost Overruns in Marine Construction Projects
AME Ayman H. Nassar
Engineering, Technology & Applied Science Research 14 (5), 16095-16102, 2024
2024
Machine Learning Approach to Predict Time Delays in Marine Construction Projects
AME Ayman H. Nassar
Engineering, Technology & Applied Science Research 14 (5), 16125-16134, 2024
2024
系统目前无法执行此操作,请稍后再试。
文章 1–20