Bi-objective group scheduling in hybrid flexible flowshop: a multi-phase approach N Karimi, M Zandieh, HR Karamooz Expert Systems with Applications 37 (6), 4024-4032, 2010 | 201 | 2010 |
An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times M Zandieh, N Karimi Journal of Intelligent Manufacturing 22 (6), 979-989, 2011 | 96 | 2011 |
Group scheduling in flexible flow shops: a hybridised approach of imperialist competitive algorithm and electromagnetic-like mechanism N Karimi, M Zandieh, AA Najafi International Journal of Production Research 49 (16), 4965-4977, 2011 | 73 | 2011 |
A branch and bound method for solving multi-factory supply chain scheduling with batch delivery N Karimi, H Davoudpour Expert Systems with Applications 42 (1), 238-245, 2015 | 56 | 2015 |
A hybrid multi-objective genetic algorithm for planning order release date in two-level assembly system with random lead times S Fallah-Jamshidi, N Karimi, M Zandieh Expert Systems with Applications 38 (11), 13549-13554, 2011 | 33 | 2011 |
Integrated production and delivery scheduling for multi-factory supply chain with stage-dependent inventory holding cost N Karimi, H Davoudpour Computational and Applied Mathematics 36 (4), 1529-1544, 2017 | 28 | 2017 |
A knowledge-based approach for multi-factory production systems N Karimi, H Davoudpour Computers & Operations Research 77, 72-85, 2017 | 27 | 2017 |
A high performing metaheuristic for multi-objective flowshop scheduling problem N Karimi, H Davoudpour Computers & operations research 52, 149-156, 2014 | 26 | 2014 |
Multi-objective colonial competitive algorithm for hybrid flowshop problem N Karimi, H Davoudpour Applied Soft Computing 49, 725-733, 2016 | 22 | 2016 |
A methodology for optimizing statistical multi-response problems using genetic local search algorithm through fuzzy goal programming M Amiri, N Karimi, SF Jamshidi Journal of Applied Sciences 8 (18), 3199-3206, 2008 | 16 | 2008 |
Nonlinear continuous multi-response problems: a novel two-phase hybrid genetic based metaheuristic S Fallah-Jamshidi, M Amiri, N Karimi Applied Soft Computing 10 (4), 1274-1283, 2010 | 14 | 2010 |
A benders decomposition algorithm for multi-factory scheduling problem with batch delivery N Karimi, H Davoudpour Scientia Iranica 24 (2), 823-833, 2017 | 2 | 2017 |