关注
Gerson Henrique Pfitscher
Gerson Henrique Pfitscher
在 unb.br 的电子邮件经过验证
标题
引用次数
引用次数
年份
Hybrid MPI/OpenMP strategy for biological multiple sequence alignment with DIALIGN-TX in heterogeneous multicore clusters
E de Araujo Macedo, ACMA de Melo, GH Pfitscher, A Boukerche
2011 IEEE International Symposium on Parallel and Distributed Processing …, 2011
182011
A microprocessor-based synchronization scheme for digitally controlled three-phase thyristor power converters
GH Pfitscher
IEEE Transactions on Industrial Electronics, 330-333, 1983
161983
A microprocessor control scheme for naturally commutated thyristor converter with variable frequency supply
GH Pfitscher
Control in Power Electronics and Electrical Drives 1983, 431-435, 1984
91984
An efficient threshold approach on distributed workstation clusters
MAR Dantas, WJ Queiroz, GH Pfitscher
HPC in Simulation, 313-317, 2000
72000
Multiple biological sequence alignment in heterogeneous multicore clusters with user-selectable task allocation policies
E de Araujo Macedo, AC Magalhaes Alves de Melo, GH Pfitscher, ...
The Journal of Supercomputing 63, 740-756, 2013
52013
PM/sup 2/P: a tool for performance monitoring of message passing applications in COTS PC clusters
M Haridasan, GH Pfitscher
Proceedings. 15th Symposium on Computer Architecture and High Performance …, 2003
52003
Use of the parallel port to measure MPI intertask communication costs in COTS PC clusters
M Haridasan, GH Pfitscher
Proceedings International Parallel and Distributed Processing Symposium, 6 pp., 2003
52003
Low-cost hybrid internal clock synchronization mechanism for COTS PC cluster
J Nonaka, GH Pfitscher, K Onisi, H Nakano
Euro-Par 2002 Parallel Processing: 8th International Euro-Par Conference …, 2002
52002
Control of thyristor converters including high safety by a fast microprocessor
JF Aubry, GH Pfitscher
IECI'80 Conf. on Applications of Mini and Microcomputers, 1980
51980
An implementation of a distributed algorithm for detection of local knots and cycles in directed graphs based on the CSP model and Java
GP de Souza, GH Pfitscher
Proceedings. Sixth IEEE International Workshop on Distributed Simulation and …, 2002
32002
Performance evaluation of two parallel programming paradigms applied to the symplectic integrator running on COTS PC cluster
LBC Passos, GH Pfitscher, TM Rocha Filho
2007 IEEE International Parallel and Distributed Processing Symposium, 1-8, 2007
22007
An evaluation of low cost hardware-assisted internal clock synchronization in PC cluster environment
J Nonaka, GH Pfitscher, K Onisi, H Nakano
Proceedings of the International Conference on Parallel and Distributed …, 2002
22002
Commande numerique directe d'un moteur a courant continu par microprocesseurs
GH Pfitscher
Institut National Polytechnique de Lorraine, 1980
21980
World Cup 2014–professional training program for brazilian hotels
S Assis, G Pfitscher, H Abdalla
International Journal of Advanced Corporate Learning (iJAC) 4 (3), 10-15, 2011
2011
PERFORMANCE OF HYBRID OpenMP/MPI PARALLEL PROGRAMMING APPLICATION OF FINITE ELEMENT METHOD
LN da Silva, FRV Verde, GH Pfitscher
2007
PARALLEL SOLUTION ON A PC CLUSTER AND BEHAVIOR ANALYSIS OF BI AND THREE-DIMENSIONAL STRUCTURAL PROBLEMS UTILIZING THE FINITE ELEMENT METHOD
FRV Verde, GH Pfitscher, DM Viana
2005
Solução Paralela em Agregado de PCs de um Código de Elementos Finitos Aplicado à Elasticidade Linear
FRV Verde, RR Ferreira, GH Pfitscher
Anais SULCOMP 1, 2005
2005
CIC-116394 Organização e Arquitetura de Computadores
R Jacobi, GH Pfitscher
Processamento em Tempo Real
GH Pfitscher
Sincronização interna, auxiliada por hardware, de relógios em cluster de PCs com Linux
J Nonaka, GH Pfitscher
系统目前无法执行此操作,请稍后再试。
文章 1–20