Results of car following analyses using global positioning system B Wolshon, Y Hatipkarasulu Journal of transportation engineering 126 (4), 324-331, 2000 | 56 | 2000 |
Advancing target price and target value design process in IPD using BIM and risk-sharing approaches P Pishdad-Bozorgi, EH Moghaddam, Y Karasulu Proceedings of the 49th ASC Annual International Conference Proceedings, San …, 2013 | 53 | 2013 |
Project level analysis of special trade contractor fatalities using accident investigation reports Y Hatipkarasulu Journal of safety research 41 (5), 451-457, 2010 | 52 | 2010 |
Introducing Building Information Modeling Course into a Newly Developed Construction Program with Various Student Backgrounds R Liu, Y Hatipkarasulu American Society for Engineering Education, 2014 | 35 | 2014 |
Women in construction: An early historical perspective Y Hatipkarasulu, ES Roff 47th ASC Annual International Conference Proceedings of Associated Schools …, 2011 | 26 | 2011 |
A GPS approach for the analysis of car following behavior Y Hatipkarasulu, B Wolshon, C Quiroga Transportation Research Board 79th Annual Meeting, 2000 | 18 | 2000 |
Identification of shareholder ethics and responsibilities in online reverse auctions for construction projects Y Hatipkarasulu, JH Gill Science and Engineering Ethics 10, 283-288, 2004 | 14 | 2004 |
Effectiveness of CPT-Based classification methods for identification of subsoil stratigraphy MT Tumay, YH Karasulu, Z Młynarek, J Wierzbicki Proceedings of the 15th European Conference on Soil Mechanics and …, 2011 | 9* | 2011 |
Practical visual presentation approach for CPT-based soil characterization and modeling Y HatipKarasulu, MT Tumay Geo-Frontiers 2011: Advances in Geotechnical Engineering, 2387-2396, 2011 | 9 | 2011 |
A conceptual approach to graphically compare construction schedules Y Hatipkarasulu Construction Innovation 20 (1), 43-60, 2020 | 8 | 2020 |
Evolution of construction education in the United States: Two case studies R Burt, Y Hatipkarasulu, MEC Nobe ASC Proc., 44th Annual Conf, 2008 | 6 | 2008 |
Variable response time lag module for car-following models: Development and structuring with fuzzy set theory Y Hatipkarasulu, B Wolshon Transportation research record 1843 (1), 50-60, 2003 | 6 | 2003 |
Multi-disciplinary Integration for design and construction freshman: Structural organization and challenges Y Hatipkarasulu, VB Canizaro, JD Murphy 2012 ASEE Annual Conference & Exposition, 25.954. 1-25.954. 13, 2012 | 5 | 2012 |
A variable response time lag module for car following models using fuzzy set theory Y Hatipkarasulu Louisiana State University and Agricultural & Mechanical College, 2002 | 5 | 2002 |
Interactive Probabilistic Risk Analysis for Construction Engineering and Management J Du, Y Hatipkarasulu, R Liu | 4 | 2014 |
A Classroom Discussion of Applied Ethics Y Hatipkarasulu, Gunhan American Society for Engineering Education, 2012 | 4 | 2012 |
Impact of Using Measured v. Corrected Tip Resistance Values in PCPT-Based Soil Characterization and Modeling MT Tumay, Y Hatipkarasulu Geo-Frontiers 2011: Advances in Geotechnical Engineering, 2544-2553, 2011 | 4 | 2011 |
A GPS based approach for the analysis of car following behavior Y Hatipkarasulu, B Wolshon, C Quiroga ASCE Journal of Transportation Engineering 126 (4), 324-331, 2000 | 4 | 2000 |
Cloud-Based Interactive Probabilistic Simulation for AEC Industry J Du, R Liu, Y Hatipkarasulu Computing in Civil and Building Engineering (2014), 1029-1036, 2014 | 3 | 2014 |
CPT/PCPT-based organic material profiling MT Tumay, Y Hatipkarasulu, ER Marx, B Cotton Proc. 18th ICSMGE, Paris, 633-636, 2013 | 3 | 2013 |