Solving multi-objective production scheduling problems using metaheuristics T Loukil, J Teghem, D Tuyttens European journal of operational research 161 (1), 42-61, 2005 | 251 | 2005 |
Differential evolution for solving multi-mode resource-constrained project scheduling problems N Damak, B Jarboui, P Siarry, T Loukil Computers & Operations Research 36 (9), 2653-2659, 2009 | 217 | 2009 |
A multi-objective production scheduling case study solved by simulated annealing T Loukil, J Teghem, P Fortemps European journal of operational research 179 (3), 709-722, 2007 | 143 | 2007 |
The Pareto fitness genetic algorithm: Test function study S Elaoud, T Loukil, J Teghem European Journal of Operational Research 177 (3), 1703-1719, 2007 | 97 | 2007 |
A genetic algorithm for robust hybrid flow shop scheduling T Chaari, S Chaabane, T Loukil, D Trentesaux International Journal of Computer Integrated Manufacturing 24 (9), 821-833, 2011 | 68 | 2011 |
Multiple crossover genetic algorithm for the multiobjective traveling salesman problem S Elaoud, J Teghem, T Loukil Electronic Notes in Discrete Mathematics 36, 939-946, 2010 | 52 | 2010 |
A rail-road PI-hub allocation problem: Active and reactive approaches F Walha, A Bekrar, S Chaabane, TM Loukil Computers in Industry 81, 138-151, 2016 | 49 | 2016 |
Solving multi-criteria scheduling flow shop problem through compromise programming and satisfaction functions MA Allouche, B Aouni, JM Martel, T Loukil, A Rebaï European journal of operational research 192 (2), 460-467, 2009 | 47 | 2009 |
A method for selecting Pareto optimal solutions in multiobjective optimization M Cheikh, B Jarboui, T Loukil, P Siarry Journal of Informatics and mathematical sciences 2 (1), 51-62, 2010 | 45 | 2010 |
Multi-objective algorithms to multi-mode resource-constrained projects under mode change disruption S Elloumi, P Fortemps, T Loukil Computers & Industrial Engineering 106, 161-173, 2017 | 42 | 2017 |
Scheduling hybrid flow shop problem with non-fixed availability constraints W Besbes, J Teghem, T Loukil European Journal of Industrial Engineering 4 (4), 413-433, 2010 | 39 | 2010 |
Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints E Dhouib, J Teghem, T Loukil International Transactions in Operational Research 20 (2), 213-232, 2013 | 32 | 2013 |
Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints E Dhouib, J Teghem, T Loukil Journal of Mathematical Modelling and Algorithms in Operations Research 12 …, 2013 | 28 | 2013 |
Dhouib-Matrix-TSP1 method to optimize octagonal fuzzy travelling salesman problem using α-cut technique M Miledi, S Dhouib, T Loukil International Journal of Computer and Information Technology (2279-0764) 10 (3), 2021 | 25 | 2021 |
The cross docking under uncertainty: State of the art F Walha, S Chaabane, A Bekrar, T Loukil 2014 international conference on advanced logistics and transport (ICALT …, 2014 | 23 | 2014 |
A goal programming model for aggregate production planning problem M Mezghani, A Rebai, A Dammak, T Loukil International Journal of Operational Research 4 (1), 23-34, 2009 | 23 | 2009 |
A green supply chain design with product life cycle considerations K Besbes, H Allaoui, G Goncalves, T Loukil Supply Chain Forum: An International Journal 14 (2), 18-25, 2013 | 21 | 2013 |
Minimizing total tardiness in the permutation flowshop scheduling problem with minimal and maximal time lags I Hamdi, T Loukil Operational Research 15, 95-114, 2015 | 20 | 2015 |
The use of discrete event simulation in hospital supply chain management A Kammoun, T Loukil, W Hachicha 2014 international conference on advanced logistics and transport (ICALT …, 2014 | 20 | 2014 |
Reactive heuristics for disrupted multi-mode resource-constrained project scheduling problem S Elloumi, T Loukil, P Fortemps Expert Systems with Applications 167, 114132, 2021 | 19 | 2021 |