关注
Professor Datin Sr.Dr. Hamimah Adnan
Professor Datin Sr.Dr. Hamimah Adnan
Quantity Surveying Department, FSPU, UiTM Malaysia
在 uitm.edu.my 的电子邮件经过验证
标题
引用次数
引用次数
年份
Analysis of effectiveness measures of construction project success in Malaysia
R Takim, H Adnan
Asian Social Science 4 (7), 74-91, 2008
2232008
Ethical issues in the construction industry: Contractor's perspective
H Adnan, N Hashim, N Mohd, N Ahmad
Procedia-social and behavioral sciences 35, 719-727, 2012
1312012
A study of construction claim management problems in Malaysia
NA Bakhary, H Adnan, A Ibrahim
Procedia economics and finance 23, 63-70, 2015
1262015
Obstacles in implementing green building projects in Malaysia
MR Bin Esa, MA Marhani, R Yaman, A Noor, HA Rashid
Australian Journal of Basic and Applied Sciences 5 (12), 1806-1812, 2011
1132011
Facility management challenges and opportunities in the Malaysian property sector
SAH bin Syed Mustapa, H Adnan, K Jusoff
Journal of Sustainable Development 1 (2), P79, 2008
862008
Clients' perspectives of risk management practice in Malaysian construction industry
NM Yusuwan, H Adnan, AF Omar, J Kamaruzaman
J. Pol. & L. 1, 121, 2008
852008
Application of Delphi method on critical success factors in joint venture projects in the Malaysian construction industry
H Adnan, R Morledge
1st Scottish Conference for Postgraduate Researchers of the Built and …, 2003
652003
Management of safety for quality construction
HN Husin, H Adnan, K Jusoff
Journal of Sustainable Development 1 (3), 41-47, 2008
612008
An assessment of risk management in joint venture projects (JV) in Malaysia
H Adnan
Asian Social Science 4 (6), 99-106, 2008
582008
Issues associated with extension of time (EoT) claim in Malaysian construction industry
NM Yusuwan, H Adnan
Procedia Technology 9, 740-749, 2013
542013
Dependency of foreign workers in Malaysian construction industry
MA Marhani, H Adnan, HE Baharuddin, MR Esa, AA Hassan
Built Environment Journal (BEJ) 9 (1), 39-50, 2012
532012
Conflict prevention in partnering projects
H Adnan, SM Shamsuddin, A Supardi, N Ahmad
Procedia-Social and Behavioral Sciences 35, 772-781, 2012
532012
Joint venture projects in Malaysian construction industry: factors critical to success
H Adnan
PQDT-Global, 2004
462004
The Malaysian construction industry’s risk management in design and build
H Adnan, K Jusoff, MK Salim
Modern Applied Science 2 (5), 27-33, 2008
432008
Maintenance Management for Public Infrastructure
H Adnan, Z Fazry, M Fauzi, I Rahmat, A Supardi
APRN Journal of Engineering and Applied Sciences 7 (11), 1514-1522, 2012
302012
OHSAS 18001: A pilot study of towards sustainable construction in Malaysia
MA Marhani, H Adnan, F Ismail
Procedia-Social and Behavioral Sciences 85, 51-60, 2013
292013
Success factors of design and build projects in public universities
H Adnan, F Bachik, A Supardi, MA Marhani
Procedia-Social and Behavioral Sciences 35, 170-179, 2012
282012
Factors affecting housing prices in Malaysia: Analysis of the supply side
AL Olanrewaju, XY Lim, SY Tan, JE Lee, H Adnan
Planning Malaysia 16, 2018
272018
Critical success factors for contractors
H Adnan, NM Yusuwan, F Yusuf, F Bachik
International Journal of Engineering and Technical Research 2 (2), 107-113, 2014
272014
Building Information Modelling (BIM) adoption by quantity surveyors: a preliminary survey from Malaysia
NAA Ismail, H Adnan, NA Bakhary
IOP Conference Series: Earth and Environmental Science 267 (5), 052041, 2019
262019
系统目前无法执行此操作,请稍后再试。
文章 1–20