Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning GH Kim, SH An, KI Kang Building and environment 39 (10), 1235-1242, 2004 | 709 | 2004 |
A case-based reasoning cost estimating model using experience by analytic hierarchy process SH An, GH Kim, KI Kang Building and Environment 42 (7), 2573-2579, 2007 | 272 | 2007 |
Neural network model incorporating a genetic algorithm in estimating construction costs GH Kim, JE Yoon, SH An, HH Cho, KI Kang Building and Environment 39 (11), 1333-1340, 2004 | 189 | 2004 |
Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates GH Kim, DS Seo, KI Kang Journal of computing in civil engineering 19 (2), 208-211, 2005 | 141 | 2005 |
Comparison of school building construction costs estimation methods using regression analysis, neural network, and support vector machine GH Kim, JM Shin, S Kim, Y Shin Scientific Research Publishing, 2013 | 126 | 2013 |
Improving tower crane productivity using wireless technology UK Lee, KI Kang, GH Kim, HH Cho Computer‐Aided Civil and Infrastructure Engineering 21 (8), 594-604, 2006 | 92 | 2006 |
Application of information technology for mass customization in the housing construction industry in Korea Y Shin, SH An, HH Cho, GH Kim, KI Kang Automation in Construction 17 (7), 831-838, 2008 | 74 | 2008 |
An initial trial mixture proportioning procedure for structural lightweight aggregate concrete KH Yang, GH Kim, YH Choi Construction and building materials 55, 431-439, 2014 | 53 | 2014 |
Shear behavior of continuous reinforced concrete T-beams using wire rope as internal shear reinforcement KH Yang, GH Kim, HS Yang Construction and Building Materials 25 (2), 911-918, 2011 | 50 | 2011 |
Cultural differences in motivation factors influencing the management of foreign laborers in the Korean construction industry S Kim, JD Kim, Y Shin, GH Kim International Journal of Project Management 33 (7), 1534-1547, 2015 | 48 | 2015 |
Comparing cost prediction methods for apartment housing projects: CBR versus ANN SY Kim, JW Choi, GH Kim, KI Kang Journal of Asian Architecture and Building Engineering 4 (1), 113-120, 2005 | 33 | 2005 |
Life Comparative Analysis of Energy Consumption and CO2 Emissions of Different Building Structural Frame Types S Kim, JH Moon, Y Shin, GH Kim, DS Seo The Scientific World Journal 2013 (1), 175702, 2013 | 32 | 2013 |
Flexural behavior of post-tensioned normal-strength lightweight concrete one-way slabs KH Yang, JH Mun, GH Kim Engineering Structures 56, 1295-1307, 2013 | 28 | 2013 |
Improved productivity using a modified table formwork system for high-rise building in Korea GH Kim, SH An, HH Cho, DS Seo, KI Kang Building and environment 40 (11), 1472-1478, 2005 | 28 | 2005 |
Comparison of risk assessment for a nuclear power plant construction project based on analytic hierarchy process and fuzzy analytic hierarchy process DW Shin, Y Shin, GH Kim Journal of Building Construction and Planning Research 4 (3), 157-171, 2016 | 27 | 2016 |
A comparison of construction cost estimation using multiple regression analysis and neural network in elementary school project HG Cho, KG Kim, JY Kim, GH Kim Journal of the Korea Institute of Building Construction 13 (1), 66-74, 2013 | 24 | 2013 |
Optimizing the mixing proportion with neural networks based on genetic algorithms for recycled aggregate concrete S Kim, HB Choi, Y Shin, GH Kim, DS Seo Advances in Materials Science and Engineering 2013 (1), 527089, 2013 | 20 | 2013 |
Analysis of structural work scheduling of green frame-focusing on apartment buildings SH Lee, SE Kim, GH Kim, JK Joo, SK Kim Journal of the Korea Institute of Building Construction 11 (3), 301-309, 2011 | 19 | 2011 |
Priority of accident cause based on tower crane type for the realization of sustainable management at Korean construction sites JY Kim, DS Lee, JD Kim, GH Kim Sustainability 13 (1), 242, 2020 | 17 | 2020 |
Sustainability Life Cycle Cost Analysis of Roof Waterproofing Methods Considering LCCO2 S Kim, GH Kim, YD Lee Sustainability 6 (1), 158-174, 2013 | 17 | 2013 |