Applying level of detail in a BIM-based project: An overall process for lean design management P Uusitalo, O Seppänen, E Lappalainen, A Peltokorpi, H Olivieri Buildings 9 (5), 109, 2019 | 49 | 2019 |
Transformation of construction project management toward situational awareness EM Lappalainen, O Seppänen, A Peltokorpi, V Singh Engineering, Construction and Architectural Management 28 (8), 2199-2221, 2021 | 22 | 2021 |
To trust or not to trust: is trust a prerequisite for solving design quality problems? P Uusitalo, E Lappalainen, O Seppänen, E Pikas, A Peltokorpi, ... Construction management and economics 39 (4), 279-297, 2021 | 19 | 2021 |
Current challenges in the adoption of digital visual management at construction sites: Exploratory case studies A Reinbold, E Lappalainen, O Seppänen, A Peltokorpi, V Singh Sustainability 14 (21), 14395, 2022 | 8 | 2022 |
Design process stability: observations of batch size, throughput time and reliability in design E Lappalainen, P Uusitalo, O Seppänen, A Peltokorpi Annual Conference of the International Group for Lean Construction, 605-612, 2021 | 8 | 2021 |
Building 2030-Hukan mittaaminen suunnittelussa ja tuotannossa loppuraportti O Seppänen, J Lehtovaara, P Uusitalo, E Lappalainen, A Ruohomäki, ... Aalto University, 2020 | 7 | 2020 |
Improving Design Quality by Contractor Involvement: An Empirical Study on Effects E Lappalainen, P Uusitalo, E Pikas, O Seppänen, A Peltokorpi, P Uusitalo, ... Buildings 12 (8), 1188, 2022 | 6 | 2022 |
Combining decentralized decision-making and takt production in construction planning and control to increase production flow J Lehtovaara, O Seppänen, A Peltokorpi, E Lappalainen, P Uusitalo Frontiers in Built Environment 8, 893790, 2022 | 3 | 2022 |
Digital Twin of a Design Process: An Exploratory Study H Abou-Ibrahim, E Lappalainen, O Seppänen Annual Conference of the International Group for Lean Construction, 1198-1209, 2022 | 3 | 2022 |
Building 2030: Hajautettu työnsuunnittelu-loppuraportti O Seppänen, J Lehtovaara, E Lappalainen, P Uusitalo, T Hiitola, ... Aalto-yliopisto, 2020 | 3 | 2020 |
Effects of Daily Management on Design Reliability E Lappalainen, P Uusitalo, H Abou Ibrahim, O Seppänen, A Hänninen, ... Annual Conference of the International Group for Lean Construction, 48-59, 2022 | 2 | 2022 |
Inventory and Piling Waste: A Computer Vision Approach I Chauhan, E Lappalainen, A Reinbold, I Palsola, O Seppänen Annual Conference of the International Group for Lean Construction, 2023 | 1 | 2023 |
Exploring Empowerment in Construction: Discovering Challenges of self-managed Workers C Görsch, E Lappalainen, J Riekki, O Seppänen, A Peltokorpi IOP Conference Series: Earth and Environmental Science 1389 (1), 012037, 2024 | | 2024 |
Monitoring Design Buzz: A Visual BIM-Based Approach H Abou-Ibrahim, E Lappalainen, J Oraskari, A Aliheidarloo IOP Conference Series: Earth and Environmental Science 1389 (1), 012009, 2024 | | 2024 |
Situational Management and Digital Situational Awareness Systems in Infrastructure Construction: Managerial Perspectives on Relevance, Challenges, and Adoption E Lappalainen, P Uusitalo, O Seppänen, A Peltokorpi, A Reinbold, ... Buildings 14 (7), 2035, 2024 | | 2024 |
User experiences of situational awareness systems in infrastructure construction E Lappalainen, P Uusitalo, O Seppänen, A Peltokorpi, A Ainamo, ... Construction Management and Economics, 1-14, 2024 | | 2024 |
Expectations and Perceptions–Daily Management Meetings in Design J Särkilahti, O Seppänen, E Lappalainen Annual Conference of the International Group for Lean Construction, 48-59, 2024 | | 2024 |
Whose Game Is It? Do Small and Medium Size Enterprises Win Alliance Contracts? E Lappalainen, A Hänninen, O Seppänen, P Uusitalo, T Heiskanen Annual Conference of the International Group for Lean Construction, 583-596, 2024 | | 2024 |
Implementing Digital Visual Management: A Case Study on Challenges and Barriers A Reinbold, E Lappalainen, P Uusitalo Annual Conference of the International Group for Lean Construction, 305-315, 2024 | | 2024 |
Building 2030: Tuotantoprosessin digitaalinen kaksonen: Loppuraportti O Seppänen, E Lappalainen, A Al Barazi, C Görsch, Y Zheng, ... | | 2023 |