关注
Hasbullah Hasbullah
Hasbullah Hasbullah
Univeristas Mercu Buana
在 mercubuana.ac.id 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Increasing overall equipment effectiveness in automotive company using DMAIC and FMEA method
A Rozak, C Jaqin, H Hasbullah
Journal Européen des Systèmes Automatisés 53 (1), 55-60, 2020
412020
Analisis Kegagalan Proses Insulasi Pada Produksi Automotive Wires (Aw) Dengan Metode Failure Mode and Effect Analysis (Fmea) Pada Pt Jlc
H Hasbullah, M Kholil, DA Santoso
Sinergi 21 (3), 193-203, 2017
352017
Reducing the product changeover time using SMED & 5S methods in the injection molding industry
D Agung, H Hasbullah
Sinergi 23 (3), 199, 2019
242019
Analysis and Defect Improvement Using FTA, FMEA, and MLR Through DMAIC Phase: Case Study in Mixing Process Tire Manufacturing Industry.
TH Febriana, H Hasbullah
Journal Européen des Systèmes Automatisés 54 (5), 2021
142021
Overstock Improvement by Combining Forecasting, EOQ, and ROP
YS Hasbullah Hasbulah
Jurnal Penelitian dan Aplikasi Sistem & Teknik Industri (PASTI) 14 (3), 230-242, 2020
13*2020
Rancang Bangun Fearless (Fire Supression and Smart Alert System) pada Kebocoran Gas
LA Rachman, H Hasbullah
Technomedia Journal 7 (2 October), 262-279, 2022
122022
Developing I4. 0 Readiness Index for Factory Operation in Indonesia to Enhance INDI 4.0
H Hasbullah, SA Bareduan, S Hasibuan
International Journal on Advanced Science, Engineering and Information …, 2021
112021
Business development strategy using swot analysis method in culinary industry
H Hasbullah, J Haekal, PR Prayogi, DEAPD Eko
Journal of Industrial Engineering & Management Research 2 (3), 53-61, 2021
92021
Measuring Productivity Index With Objective Matrix (Omax) Method in the Diecasting Aluminum Industry
O Kustadi, Hasbullah
International Journal of Mechanical and Production Engineering Research and …, 2019
92019
Analysis of new production line project improvement through critical path method (cpm), design structure matrix (dsm) and program evaluation and review (pert)
YB Suryono, H Hasbullah
Journal of Industrial Engineering & Management Research 1 (4), 9-17, 2020
82020
BALANCED SCORECARD: LITERATURE REVIEW AND IMPLEMENTATION IN ORGANIZATION
HH Deni Ahmad Taufik, Humiras Hardi Purba
Operations Excellence 13 (1), 111-123, 2021
7*2021
Application of Lean Manufacturing in The Painting Plant Manufacturing Process by Reducing Waste Waiting A Case Study at PT. Koba Multi Indonesia
H Hipni, Ahmad
International Journal of Mechanical and Production Engineering Research and …, 2019
7*2019
THE FRAMEWORK MODEL OF DIGITAL COOPERATIVE TO EXPLORE ECONOMIC POTENTIAL IN HIGHER EDUCATION
H Hasbullah, SA Bareduan
Sinergi 25 (2), 195-206, 2021
52021
Teknologi Kinerja
R Hartono, H Hasbullah, S Sutomo
CV WIDINA MEDIA UTAMA, 2022
42022
Problem-solving step analysis for increasing tire static balance levels: a case study
TH Febriana, H Herlambang, H Hernadewita, H Hasbullah, A Halim
Jurnal Sistem dan Manajemen Industri 5 (1), 15-24, 2021
42021
Improving material shortage for small-medium enterprises (SME) in pest control industry
H Hasbullah, MM Mustarih, AA Wibowo
Journal of Industrial Engineering & Management Research 2 (3), 62-71, 2021
42021
Impact of upgrading iso 9001: 2008 to ISO 9001: 2015 on internal rejects in automotive company
D Afriyuddin, Herdiawan, Hasbullah, HH Purba
IOP Conference Series: Materials Science and Engineering 508 (1), 012102, 2019
42019
" Revolusi Mental" Birokrasi Di Indonesia: Good Governance
SUT Firdaus, H Hasbullah
Public Corner 14 (2), 13-25, 2019
42019
Pricing of Medical Instrument Products for Domestic Production through Investment Feasibility Analysis
H Hasbullah, M Nasir
ComTech: Computer, Mathematics and Engineering Applications 12 (1), 9-18, 2021
32021
Designing performance measurement with the balanced scorecard method in the tourism service industry
DS Nasuka, H Hasbullah
Journal of Industrial Engineering & Management Research 1 (4), 27-35, 2020
32020
系统目前无法执行此操作,请稍后再试。
文章 1–20