A multi-population, multi-objective memetic algorithm for energy-efficient job-shop scheduling with deteriorating machines M Abedi, R Chiong, N Noman, R Zhang Expert Systems with Applications 157, 113348, 2020 | 100 | 2020 |
An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem H Seidgar, M Kiani, M Abedi, H Fazlollahtabar International Journal of Production Research 52 (4), 1240-1256, 2014 | 81 | 2014 |
Bi-objective optimisation for scheduling the identical parallel batch-processing machines with arbitrary job sizes, unequal job release times and capacity limits M Abedi, H Seidgar, H Fazlollahtabar, R Bijani International Journal of Production Research 53 (6), 1680-1711, 2015 | 52 | 2015 |
Optimising the job-shop scheduling problem using a multi-objective Jaya algorithm L He, W Li, R Chiong, M Abedi, Y Cao, Y Zhang Applied Soft Computing 111, 107654, 2021 | 35 | 2021 |
A modified genetic algorithm for non-emergency outpatient appointment scheduling with highly demanded medical services considering patient priorities R Alizadeh, J Rezaeian, M Abedi, R Chiong Computers & Industrial Engineering 139, 106106, 2020 | 23 | 2020 |
Hybrid scheduling and maintenance problem using artificial neural network based meta-heuristics M Abedi, H Seidgar, H Fazlollahtabar Journal of Modelling in Management 12 (3), 525-550, 2017 | 18 | 2017 |
A hybrid particle swarm optimisation for scheduling just-in-time single machine with preemption, machine idle time and unequal release times H Seidgar, M Abedi, S Tadayonirad, H Fazlollahtabar International Journal of Production Research 53 (6), 1912-1935, 2015 | 16 | 2015 |
A hybrid particle swarm optimisation approach for energy-efficient single machine scheduling with cumulative deterioration and multiple maintenances M Abedi, R Chiong, N Noman, R Zhang 2017 IEEE Symposium Series on Computational Intelligence (SSCI), 1-8, 2017 | 15 | 2017 |
An efficient hybrid of genetic and simulated annealing algorithms for multi server vehicle routing problem with multi entry H Seidgar, M Abedi, ST Rad, J Rezaeian International Journal of Industrial and Systems Engineering 24 (3), 333-360, 2016 | 14 | 2016 |
A new mathematical model for scheduling flexible flow shop problem with learning and forgetting effects of workers H Seidgar, M Abedi, ST Rad International Journal of Industrial and Systems Engineering 21 (4), 534-549, 2015 | 12 | 2015 |
JIT-scheduling in unrelated parallel-machine environment with aging effect and multi-maintenance activities Y Zarook, M Abedi International Journal of Services and Operations Management 18 (1), 99-113, 2014 | 12 | 2014 |
A new bi-level meta-heuristic approach for a single machine JIT-scheduling in the batch delivery system with controllable due dates M Abedi, H Seidgar International Journal of Services and Operations Management 23 (2), 135-152, 2016 | 10 | 2016 |
Learning and forgetting effects of flexible flow shop scheduling N Tyagi, H Seidgar, M Abedi, AB Chandramouli International journal of innovation and applied studies 7 (3), 857, 2014 | 8 | 2014 |
A regional multi-objective Tabu search algorithm for a green heterogeneous dial-a-ride problem M Abedi, R Chiong, R Athauda, H Seidgar, Z Michalewicz, A Sturt 2019 IEEE Congress on Evolutionary Computation (CEC), 2082-2089, 2019 | 5 | 2019 |
A preemptive scheduling and due date assignment for single-machine in batch delivery system N Tyagi, M Abedi, RG Varshney Conference on Advances in Communication and Control Systems (CAC2S 2013), 60-64, 2013 | 5 | 2013 |
Single machine scheduling in a batch delivery system with fixed delivery dates N Tyagi, M Abedi, RG Varshney International Journal of Engineering and Technology 5 (4), 3484-3488, 2013 | 4 | 2013 |
Genetic algorithm for minimization of total cost including customer’s waiting cost and machine setup cost for sequence dependent jobs on a single processor N Tyagi, M Abedi, RG Varshney, Y Zarook, AB Chandramouli Journal of Engineering Technology 2, 97-109, 2014 | 2 | 2014 |
A Metaheuristic Framework for Energy-Intensive Industries With Batch Processing Machines M Abedi, R Chiong, N Noman, X Liao, D Li IEEE Transactions on Engineering Management 71, 4502-4516, 2022 | 1 | 2022 |
A Two-phase Heuristic Method for Agri-fresh Inventory Optimisation M Abedi, P Paam, R Berretta 2020 IEEE Symposium Series on Computational Intelligence (SSCI), 2608-2615, 2020 | | 2020 |
Quality Control and Productivity Management M Abedi, F Kangi AHA, 2015 | | 2015 |