Flexural behavior of steel reinforced lightweight concrete slab with bamboo permanent formworks Z Gazalba Procedia Engineering 125, 865-872, 2015 | 21 | 2015 |
PERENCANAAN KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROYEK KONSTRUKSI DENGAN TINGKAT RESIKO TINGGI (STUDI PADA PROYEK ROYAL AVILLA MALIMBU): Safety and Health Planning (K3 … A Gerhan, Z Gazalba Spektrum Sipil 6 (1), 45-55, 2019 | 3 | 2019 |
ANALISIS KEBUTUHAN TENAGA KERJA DAN PERALATAN PADA PROYEK PENINGKATAN JALAN: Studi Pada Pelaksanaan Proyek Peningkatan Jalan Pancor-Rempung I Arisandi, IGP Warka, Z Gazalba Ganec Swara 12 (2), 1-7, 2018 | 3 | 2018 |
Hybrid Reinforced Concrete Frame Building With Pumice Brick Masonry Infill Under Statics Lateral Loading A Akmaluddin, RS Saftaningtyas, S Rawiana, Z Gazalba International Journal of Engineering and Technology 2 (8), 1482-1491, 2012 | 3 | 2012 |
Penyuluhan dan Percontohan Desain Pengembangan Rumah Subsidi yang Sehat dan Nyaman bagi Penghuni GAPP Kamase, T Handayani, Z Gazalba Jurnal Abdi Insani 9 (4), 1354-1365, 2022 | 2 | 2022 |
Evaluasi Kewajaran Schedule Kontraktor Menggunakan Work Breakdown Structure (WBS) dan Microsoft Project (Studi Pada Proyek Pembangunan SDN 5 Sokong, Tanjung, Lombok Utara) Z GAZALBA, IGP WARKA GANEC SWARA 16 (1), 1285-1296, 2022 | 2 | 2022 |
Desain Pengembangan Desa Wisata Setanggor Berbasis Arsitektur Tradisional Pendukung Pariwisata Mandalika-Lombok RS Saptaningtyas, Z Gazalba, T Handayani, IW Sugiartha, PJ Putra Jurnal Arsitektur, Bangunan, & Lingkungan 11 (2), 141-150, 2022 | 2 | 2022 |
PENGEMBANGAN METODE PENINGKATAN KUALITAS LIMBAH AGREGAT BATU APUNG SEBAGAI MATERIAL BETON STRUKTURAL: The Development of Quality Improvement of Purnice Waste Aggregate as … S Suparjo, A Akmaluddin, Z Gazalba, T Handayani Spektrum Sipil 1 (2), 169-178, 2014 | 2 | 2014 |
Sandwich concrete panel reinforced with sisal fiber mesh for application in wall construction system S Murtiadi, A Akmaluddin, Z Gazalba, S Sinarep Proceeding of the 1 st International Conference on Infrastructure …, 2013 | 2 | 2013 |
Analisis Penjadwalan Dengan Percepatan Pelaksanaan Menggunakan Metode Penambahan Jumlah Tenaga Kerja Dan Jam Kerja LW WIRADARMA, Z GAZALBA, T HANDAYANI Ganec Swara 17 (1), 115-123, 2023 | 1 | 2023 |
ANALISIS WAKTU DAN BIAYA BERDASARKAN ANALISA PRODUKTIVITAS TENAGA KERJA PADA PEMBANGUNAN PUSKESMAS MENINTING KABUPATEN LOMBOK BARAT IGP WARKA, Z GAZALBA, T HANDAYANI GANEC SWARA 17 (1), 131-144, 2023 | 1 | 2023 |
KONSTRUKSI BAMBU PLESTER UNTUK RUMAH LAYAK HUNI DAN TAHAN GEMPA DI DESA REMBITAN KECAMATAN PUJUT KABUPATEN LOMBOK TENGAH T Handayani, RS Saptaningtyas, Z Gazalba, JCU Bachtiar, F Hastati Jurnal Pepadu 3 (4), 481-489, 2022 | 1 | 2022 |
Analisis perbandingan rencana anggaran biaya (rab) pekerjaan pelat beton konvensional dan pelat beton boundeck Z GAZALBA, IGP WARKA Ganec Swara 16 (1), 1277-1284, 2022 | 1 | 2022 |
Kajian Arsitektur Vernakular dan Ramah Lingkungan pada Gedung Kampus Universitas Mataram T Handayani, R Saptaningtyas, Z Gazalba, GPAP Kamase, JCU Bachtiar, ... SADE: Jurnal Arsitektur, Planologi dan Teknik Sipil 1 (2), 86-94, 2021 | 1 | 2021 |
Taman Restoratif: Kriteria Desain Taman untuk Mengurangi Tingkat Stress Pengunjung JCU Bachtiar, HE Kusuma, Z Gazalba SADE: Jurnal Arsitektur, Planologi dan Teknik Sipil 1 (1), 20-27, 2021 | 1 | 2021 |
Penyuluhan Lingkungan Bersih Dengan Pengelolaan Sampah 3R (Reduce, Reuse & Recycle) Di Desa Sisik Kabupaten Lombok Tengah A Setiawan, A Akmaluddin, M Wahyudi, Z Gazalba Prosiding Konferensi Nasional Pengabdian Kepada Masyarakat dan Corporate …, 2018 | 1 | 2018 |
Structural Behavior of Steel Reinforced Sandwich Concrete Beam with Pumice Lightweight Concrete Core A Akmaluddin, S Murtiadi, Z Gazalba Applied Mechanics and Materials 845, 158-165, 2016 | 1 | 2016 |
Manajemen konstruksi Z Gazalba Mataram University Press, 2005 | 1 | 2005 |
NENSEK DAN RUANG PEREMPUAN SASAK DI DUSUN KELOKE DESA BATUJAI KACAMATAN PRAYA BARAT KABUPATEN LOMBOK TENGAH LHS Wardi, RS Saptaningtiyas, Z Gazalba, PJ Putra, MI Raissilki Jurnal Cakrawala Ilmiah 3 (7), 2187-2196, 2024 | | 2024 |
EVALUASI POTENSI RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROYEK PEMBANGUNAN PLTMGU LOMBOK (PEAKER) 130–150 MEGAWATT DENGAN METODE JOB SAFETY ANALYSIS (JSA) LW WIRADARMAN, T HANDAYANI, Z GAZALBA, IW SUTEJA GANEC SWARA 17 (3), 927-942, 2023 | | 2023 |