Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects J Song, CT Haas, C Caldas, E Ergen, B Akinci Automation in construction 15 (2), 166-177, 2006 | 360 | 2006 |
Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS E Ergen, B Akinci, R Sacks Automation in construction 16 (3), 354-367, 2007 | 350 | 2007 |
BIM for building refurbishment and maintenance: current status and research directions D Ilter, E Ergen Structural survey 33 (3), 228-256, 2015 | 202 | 2015 |
Tracking components and maintenance history within a facility utilizing radio frequency identification technology E Ergen, B Akinci, B East, J Kirby Journal of Computing in Civil Engineering 21 (1), 11-20, 2007 | 197 | 2007 |
Life-cycle data management of engineered-to-order components using radio frequency identification E Ergen, B Akinci, R Sacks Advanced Engineering Informatics 21 (4), 356-366, 2007 | 166 | 2007 |
Analyzing the benefits of RFID technology for cost sharing in construction supply chains: A case study on prefabricated precast components G Demiralp, G Guven, E Ergen Automation in construction 24, 120-129, 2012 | 137 | 2012 |
Technological assessment of radio frequency identification technology for indoor localization A Pradhan, E Ergen, B Akinci Journal of Computing in Civil Engineering 23 (4), 230-238, 2009 | 131 | 2009 |
Technological assessment and process implications of field data capture technologies for construction and facility/infrastructure management S Kiziltas, B Akinci, E Ergen, P Tang, C Gordon Journal of Information Technology in Construction (ITcon) 13 (10), 134-154, 2008 | 121 | 2008 |
Utilizing radio frequency identification on precast concrete components- supplier's perspective. B Akinci, M Patton, E Ergen ISARC 2002: 19 th International Symposium on Automation and Robotics in …, 2002 | 101 | 2002 |
Modeling and analyzing the impact of technology on data capture and transfer processes at construction sites: a case study B Akinci, S Kiziltas, E Ergen, IZ Karaesmen, F Keceli Journal of construction engineering and management 132 (11), 1148-1157, 2006 | 88 | 2006 |
Sensing and field data capture for construction and facility operations S Taneja, B Akinci, JH Garrett, L Soibelman, E Ergen, A Pradhan, P Tang, ... Journal of construction engineering and management 137 (10), 870-881, 2011 | 85 | 2011 |
An overview of approaches for utilizing RFID in construction industry E Ergen, B Akinci 2007 1st Annual RFID Eurasia, 1-5, 2007 | 69 | 2007 |
Diffusion of green building guidelines as innovation in developing countries S Mollaoglu, C Chergia, E Ergen, M Syal Construction innovation 16 (1), 11-29, 2016 | 51 | 2016 |
Assessment of the capabilities of a commercial 4D CAD system to visualize equipment space requirements on construction sites B Akinci, K Tantisevi, E Ergen Construction Research Congress: Wind of Change: Integration and Innovation, 1-7, 2003 | 49 | 2003 |
Formalization of the flow of component-related information in precast concrete supply chains E Ergen, B Akinci Journal of Construction Engineering and Management 134 (2), 112-121, 2008 | 44 | 2008 |
A decision making support tool for selecting green building certification credits based on project delivery attributes S Seyis, E Ergen Building and Environment 126, 107-118, 2017 | 39 | 2017 |
3D modeling and real-time monitoring in support of lean production of engineered-to-order precast concrete buildings R Sacks, B Akinci, E Ergen Proceedings of the 11th Annual Conference of the International Group for …, 2003 | 34 | 2003 |
Structural equation model of occupant satisfaction for evaluating the performance of office buildings I Tekce, E Ergen, D Artan Arabian journal for science and engineering 45 (10), 8759-8784, 2020 | 33 | 2020 |
Implementation of a BIM-FM platform at an international airport project: Case study B Kula, E Ergen Journal of Construction Engineering and Management 147 (4), 05021002, 2021 | 28 | 2021 |
Determining the level of development for BIM implementation in large-scale projects: a multi-case study R Alshorafa, E Ergen Engineering, Construction and Architectural Management 28 (1), 397-423, 2021 | 28 | 2021 |