关注
Reza Shahabi-Shahmiri
Reza Shahabi-Shahmiri
Department of Industrial Engineering, University of Tehran
在 ut.ac.ir 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
A routing and scheduling problem for cross-docking networks with perishable products, heterogeneous vehicles and split delivery
R Shahabi-Shahmiri, S Asian, R Tavakkoli-Moghaddam, SM Mousavi, ...
Computers & industrial engineering 157, 107299, 2021
412021
A new approach for production project scheduling with time-cost-quality trade-off considering multi-mode resource-constraints under interval uncertainty
M Ghasemi, SM Mousavi, S Aramesh, R Shahabi-Shahmiri, ...
International Journal of Production Research 61 (9), 2963-2985, 2023
112023
Sustainable project portfolio selection and optimization with considerations of outsourcing decisions, financing options and staff assignment under interval type-2 fuzzy …
V Mohagheghi, SM Mousavi, R Shahabi-Shahmiri
Neural Computing and Applications 34 (17), 14577-14598, 2022
112022
An optimization model for construction project scheduling by considering CO2 emissions with multi-mode resource constraints under interval-valued fuzzy uncertainty
S Aramesh, SM Mousavi, M Ghasemi, R Shahabi-Shahmiri
International Journal of Environmental Science and Technology 20 (1), 87-102, 2023
82023
An integrated chance-constrained stochastic model for a preemptive multi-skilled multi-mode resource-constrained project scheduling problem: a case study of building a sports …
SA Mirnezami, R Tavakkoli-Moghaddam, R Shahabi-Shahmiri, ...
Engineering Applications of Artificial Intelligence 126, 106726, 2023
32023
A chance-constrained programming method with credibility measure for solving the multi-skill multi-mode resource-constrained project scheduling problem
M Ghasemi, RK Chakrabortty, R Shahabi-Shahmiri, SA Mirnezami
International Journal of Construction Management 24 (10), 1090-1106, 2024
12024
Multi-skill resource-constrained project scheduling problem considering overlapping: fuzzy multi-objective programming approach to a case study
F Zarei, M Arashpour, SA Mirnezami, R Shahabi-Shahamiri, M Ghasemi
International Journal of Construction Management 24 (8), 820-833, 2024
12024
A robust chance-constrained programming approach for a bi-objective pre-emptive multi-mode resource-constrained project scheduling problem with time crashing
R Shahabi-Shahmiri, TS Kyriakidis, M Ghasemi, SA Mirnezami, S Mirjalili
International Journal of Systems Science: Operations & Logistics 10 (1), 2253147, 2023
2023
A Fuzzy Location-Allocation Problem for Sustainable Design of a Municipal Solid Waste Management Network
SA Mirnezami, A Siadat, R Shahabi
Journal of Quality Engineering and Production Optimization 5 (1), 165-188, 2020
2020
系统目前无法执行此操作,请稍后再试。
文章 1–9