关注
Majeed Heydari
Majeed Heydari
在 znu.ac.ir 的电子邮件经过验证
标题
引用次数
引用次数
年份
Extension of VIKOR method for decision making problem with interval numbers
MK Sayadi, M Heydari, K Shahanaghi
Applied mathematical modelling 33 (5), 2257-2262, 2009
6172009
Failure modeling and optimizing preventive maintenance strategy during two-dimensional extended warranty contracts
K Shahanaghi, R Noorossana, SG Jalali-Naini, M Heydari
Engineering Failure Analysis 28, 90-102, 2013
1142013
A new optimization model for market basket analysis with allocation considerations: A genetic algorithm solution approach
M Heydari, A Yousefli
Management & Marketing 12 (1), 1-11, 2017
292017
Extended VIKOR as a new method for solving Multiple Objective Large-Scale Nonlinear Programming problems
M Heydari, MK Sayadi, K Shahanaghi
RAIRO-operations Research 44 (2), 139-152, 2010
232010
A new heuristic model for fully fuzzy project scheduling
A Yousefli, M Ghazanfari, K Shahanaghi, M Heydari
Journal of Uncertain Systems 2 (1), 75-80, 2008
182008
Change point estimation of a process variance with a linear trend disturbance
R Noorossana, M Heydari
JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL …, 2009
92009
Two-dimensional extended warranty cost analysis for multi-component repairable products
K Shahanaghi, M Heydari
International Journal of Mathematical Models and Methods in Applied Sciences …, 2013
82013
Change point estimation of a normal process variance with monotonic change
R Noorossana, M Heydari
Scientia Iranica 19 (3), 885-894, 2012
72012
Optimal inspection policy for a second-hand product with a two-dimensional warranty
M Heydari
IMA Journal of Management Mathematics 33 (3), 395-416, 2022
62022
Two-stage failure modeling and optimal periodic inspection policy during the extended warranty period
M Heydari
International Journal of Management Science and Engineering Management 14 (4 …, 2019
62019
Modeling product failures and determining optimal upgrade, preventive maintenance and price decisions in two-dimensional extended warranty contracts
M Heydari, M Alimohammadi, K Shahanaghi
Industrial Engineering & Management Systems 17 (3), 497-513, 2018
62018
A data-driven stochastic decision support system to investment portfolio problem under uncertainty
A Yousefli, M Heydari, R Norouzi
Soft Computing 26 (11), 5283-5296, 2022
52022
Development of Linear Programming Technique for Multidimensional Analysis of Preference in Fuzzy Environment
A Yousefli, M Heydari, K Shahanaghi
Journal of Uncertain Systems 3 (2), 108-113, 2009
32009
Identifying and ranking earthquake disaster prevention strategies in Tehran
M Sadeghi, K Shahanaghi, M Heydari
International Journal of Management and Decision Making 15 (1), 16-37, 2016
22016
Mazandaran Road construction During the First Pahlavi
M Heydari, M Sadeghi
Khordnameh 4 (12), 59-78, 2013
22013
Optimal Design of Maintenance Service Contract Considering Preventive Maintenance, Random Repair Cost and Time Value of Money.
M Heydari, A Yousefli
International Journal of Research in Industrial Engineering (2783-1337) 13 (3), 2024
2024
系统目前无法执行此操作,请稍后再试。
文章 1–16