Extension of VIKOR method for decision making problem with interval numbers MK Sayadi, M Heydari, K Shahanaghi Applied mathematical modelling 33 (5), 2257-2262, 2009 | 617 | 2009 |
Failure modeling and optimizing preventive maintenance strategy during two-dimensional extended warranty contracts K Shahanaghi, R Noorossana, SG Jalali-Naini, M Heydari Engineering Failure Analysis 28, 90-102, 2013 | 114 | 2013 |
A new optimization model for market basket analysis with allocation considerations: A genetic algorithm solution approach M Heydari, A Yousefli Management & Marketing 12 (1), 1-11, 2017 | 29 | 2017 |
Extended VIKOR as a new method for solving Multiple Objective Large-Scale Nonlinear Programming problems M Heydari, MK Sayadi, K Shahanaghi RAIRO-operations Research 44 (2), 139-152, 2010 | 23 | 2010 |
A new heuristic model for fully fuzzy project scheduling A Yousefli, M Ghazanfari, K Shahanaghi, M Heydari Journal of Uncertain Systems 2 (1), 75-80, 2008 | 18 | 2008 |
Change point estimation of a process variance with a linear trend disturbance R Noorossana, M Heydari JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL …, 2009 | 9 | 2009 |
Two-dimensional extended warranty cost analysis for multi-component repairable products K Shahanaghi, M Heydari International Journal of Mathematical Models and Methods in Applied Sciences …, 2013 | 8 | 2013 |
Change point estimation of a normal process variance with monotonic change R Noorossana, M Heydari Scientia Iranica 19 (3), 885-894, 2012 | 7 | 2012 |
Optimal inspection policy for a second-hand product with a two-dimensional warranty M Heydari IMA Journal of Management Mathematics 33 (3), 395-416, 2022 | 6 | 2022 |
Two-stage failure modeling and optimal periodic inspection policy during the extended warranty period M Heydari International Journal of Management Science and Engineering Management 14 (4 …, 2019 | 6 | 2019 |
Modeling product failures and determining optimal upgrade, preventive maintenance and price decisions in two-dimensional extended warranty contracts M Heydari, M Alimohammadi, K Shahanaghi Industrial Engineering & Management Systems 17 (3), 497-513, 2018 | 6 | 2018 |
A data-driven stochastic decision support system to investment portfolio problem under uncertainty A Yousefli, M Heydari, R Norouzi Soft Computing 26 (11), 5283-5296, 2022 | 5 | 2022 |
Development of Linear Programming Technique for Multidimensional Analysis of Preference in Fuzzy Environment A Yousefli, M Heydari, K Shahanaghi Journal of Uncertain Systems 3 (2), 108-113, 2009 | 3 | 2009 |
Identifying and ranking earthquake disaster prevention strategies in Tehran M Sadeghi, K Shahanaghi, M Heydari International Journal of Management and Decision Making 15 (1), 16-37, 2016 | 2 | 2016 |
Mazandaran Road construction During the First Pahlavi M Heydari, M Sadeghi Khordnameh 4 (12), 59-78, 2013 | 2 | 2013 |
Optimal Design of Maintenance Service Contract Considering Preventive Maintenance, Random Repair Cost and Time Value of Money. M Heydari, A Yousefli International Journal of Research in Industrial Engineering (2783-1337) 13 (3), 2024 | | 2024 |