A BIM-and sensor-based tower crane navigation system for blind lifts G Lee, J Cho, S Ham, T Lee, G Lee, SH Yun, HJ Yang Automation in construction 26, 1-10, 2012 | 173 | 2012 |
A laser-technology-based lifting-path tracking system for a robotic tower crane G Lee, HH Kim, CJ Lee, SI Ham, SH Yun, H Cho, BK Kim, GT Kim, K Kim Automation in Construction 18 (7), 865-874, 2009 | 122 | 2009 |
Subcontractor evaluation and management framework for strategic partnering CS Eom, SH Yun, JH Paek Journal of Construction Engineering and Management 134 (11), 842-851, 2008 | 110 | 2008 |
Preliminary study for performance analysis of BIM-based building construction simulation system S Yun, K Jun, C Son, S Kim KSCE Journal of Civil Engineering 18, 531-540, 2014 | 22 | 2014 |
A stacking heterogeneous ensemble learning method for the prediction of building construction project costs U Park, Y Kang, H Lee, S Yun Applied sciences 12 (19), 9729, 2022 | 19 | 2022 |
The case study of BIM-based quantity take-off for concrete and formwork KH Jun, SH Yun Journal of KIBIM 1 (1), 13-17, 2011 | 19 | 2011 |
Unscented information filtering method for reducing multiple sensor registration error YS Kim, JH Lee, HM Do, BK Kim, T Tanikawa, K Ohba, G Lee, SH Yun 2008 IEEE International Conference on Multisensor Fusion and Integration for …, 2008 | 18 | 2008 |
Basic research on BIM-based quantity take-off guidelines S Yun, S Kim Architectural research 15 (2), 103-109, 2013 | 17 | 2013 |
Analysis of re-bar manufacturing system in plant and its facilitate method HH Cho, TK Kang, HY Park, SH Yun, YK Hur, U Park Korean Journal of Construction Engineering and Management 8 (1), 57-65, 2007 | 13 | 2007 |
A study on a method for tracking lifting paths of a tower crane using GPS in the BIM environment SH Yun, CW Park, G Lee, K Bongkeun J Architect Inst Korea 24, 163e70, 2008 | 11 | 2008 |
A study on the BIM based architectural construction simulation system using combinative construction schedule creation method J Jo, JH Park, WH Park, SH Yun, JH Paek Journal of The Architectural Institute of Korea (Structure & Construction …, 2008 | 11 | 2008 |
Performance analysis of construction cost prediction using neural network for multioutput regression S Yun Applied Sciences 12 (19), 9592, 2022 | 10 | 2022 |
A study on the Improving Effectiveness of Quantity Estimation with BIM BM Kim, HJ Jeon, SJ Jang, SH Yun, JH Paek Proc. of Conference in Architectural Institute of Korea, Architectural …, 2008 | 10 | 2008 |
Improvement of BoQ documents for the BIM based quantity takeoff JW An, S Yun Journal of KIBIM 7 (2), 16-24, 2017 | 9 | 2017 |
A preliminary study of BIM based high-rise mixed-use building maintenance management system JH Park, S Yun, J Paek Journal of the Architectural Institute of Korea 25 (6), 35-42, 2009 | 9 | 2009 |
A case study on reason analysis for schedule delay of apartment house CW Park, SH Yun Journal of the Korea Institute of Building Construction 9 (1), 89-94, 2009 | 9 | 2009 |
A holistic view of building information modeling education in post-secondary institutions N Lee, SH YUN 2015 ASEE Annual Conference & Exposition, 26.56. 1-26.56. 10, 2015 | 8 | 2015 |
A case study of life cycle cost analysis on apartment houses and Han-Ok KW Kim, SH Yun Journal of the Korea Institute of Building Construction 10 (6), 1-6, 2010 | 8 | 2010 |
A Study on the Maintenance and Management System Using BIM in Whole Phases of Public Project S Cho, Y Cho, WH Park, SH Yun, JH Paek Journal of Architectural Institute of Korea 28 (1), 697-700, 2008 | 8 | 2008 |
A study on the reduction plan of construction disaster using RFID/USN technology JH Lee, KH Park, SH Yun, JH Paek Proceeding of Architectural Institute of Korea 26 (1), 605-608, 2006 | 8 | 2006 |