关注
sennakrishnan jeyakumar
sennakrishnan jeyakumar
professor of mathematics, govt.arts college
在 gacbe.ac.in 的电子邮件经过验证
标题
引用次数
引用次数
年份
Steady state analysis of a bulk queue with multiple vacations, setup times with N-policy and closedown times
R Arumuganathan, S Jeyakumar
Applied Mathematical Modelling 29 (10), 972-986, 2005
1512005
A study on the behaviour of the server breakdown without interruption in a MX/G (a, b)/1 queueing system with multiple vacations and closedown time
S Jeyakumar, B Senthilnathan
Applied Mathematics and Computation 219 (5), 2618-2633, 2012
522012
Analysis of a bulk queue with multiple vacations and closedown times
R Arumuganathan, S Jeyakumar
International journal of information and management sciences 15 (1), 45-60, 2004
412004
Modelling and analysis of a bulk service queueing model with multiple working vacations and server breakdown
S Jeyakumar, B Senthilnathan
RAIRO-Operations Research-Recherche Opérationnelle 51 (2), 485-508, 2017
302017
A non-Markovian bulk queue with multiple vacations and control policy on request for re-service
S Jeyakumar, R Arumuganathan
Quality Technology & Quantitative Management 8 (3), 253-269, 2011
282011
Steady state analysis of bulk arrival and bulk service queueing model with multiple working vacations
S Jeyakumar, B Senthilnathan
International Journal of Mathematics in Operational Research 9 (3), 375-394, 2016
272016
Modelling and analysis of a Mx/G(a,b)/1 queue with multiple vacations, setup time, closedown time and server breakdown without interruption
S Jeyakumar, B Senthilnathan
International Journal of Operational Research 19 (1), 114-139, 2014
252014
A study on MX/G(a, b)/1 queue with server breakdown without interruption and controllable arrivals during multiple adaptive vacations
S Jeyakumar, E Rameshkumar
International Journal of Mathematics in Operational Research 15 (2), 137-155, 2019
122019
Steady state analysis of a non-Markovian bulk queue with restricted vacations
S Jeyakumar, R Arumuganathan
International Journal of Operational Research 10 (3), 307-332, 2011
122011
Non-Markovian bulk queueing system with state dependent arrivals and multiple vacations–a simulation approach
KS Ramaswami, S Jeyakumar
International Journal of Mathematics in Operational Research 6 (3), 344-356, 2014
112014
Steady state analysis of a Mx/G/1 queue with two service modes and multiple vacations
S Jeyakumar, R Arumuganathan
International Journal of Industrial and Systems Engineering 3 (6), 692-710, 2008
112008
A study on bulk arrival non Markovian single service queue with state dependent service
R Arumuganathan, S Jeyakumar
Opsearch 47, 128-142, 2010
72010
Performance Analysis and Cost Optimization of Non-Markovian Bulk Queue with'p'-Entering Discipline during Multiple Adaptive Vacations
S Jeyakumar, E Rameshkumar
International Journal of Information and Management Sciences 28 (2), 99-111, 2017
62017
An analysis of discrete queue with disaster and single vacation
S Jeyakumar, P Gunasekaran
International Journal of Pure and Applied Mathematics 113 (6), 82-90, 2017
52017
Design of robust H2/H-infinity controllers of DC-DC SEPIC converter for effective set point tracking
V Sundaramoorthy, S Jeyakumar, V Rajakumar, V Veerasamy
Int. J. Pure Appl. Math 118 (24), 1-15, 2018
42018
Analysis of MX/G (a, b)/1 queue with closedown time with controllable arrival during multiple adaptive vacations
S Jeyakumar, E Rameshkumar
International Journal of Pure and Applied Mathematics 6, 79-87, 2016
42016
Binomial service and multiple adaptive vacation schedules for Mx/G/1 queue with control policy on demand for re-service.
S Jeyakumar, E Rameshkumar
Nonlinear Studies 24 (2), 2017
22017
Mathematical analysis on production control in manufacturing units under disaster and repair with compulsory vacation
S Jeyakumar, B Logapriya
OPSEARCH, 1-18, 2024
2024
Analysis of non-Markovian queueing system in the productivity control of cotton industry under disaster
S Jeyakumar, B Logapriya
International Journal of Industrial and Systems Engineering 48 (4), 511-530, 2024
2024
Production analysis of manufacturing industry in a single vacation policy under disaster.
S Jeyakumar, B Logapriya
Journal of Mathematical Models in Engineering 9 (4), 2023
2023
系统目前无法执行此操作,请稍后再试。
文章 1–20