Prefab architecture: A guide to modular design and construction RE Smith John Wiley & Sons, 2010 | 707 | 2010 |
Offsite architecture: Constructing the future RE Smith, JD Quale Taylor & Francis, 2017 | 124 | 2017 |
Off-site and modular construction explained RE Smith National institute of building sciences, 2016 | 93 | 2016 |
Post occupancy evaluation in higher education A Tookaloo, R Smith Procedia engineering 118, 515-521, 2015 | 62 | 2015 |
Mass timber: evaluating construction performance RE Smith, G Griffin, T Rice, B Hagehofer-Daniell Architectural Engineering and Design Management 14 (1-2), 127-138, 2018 | 57 | 2018 |
Permanent modular construction: Process, practice, performance RE Smith, T Rice Permanent modular construction, 2015 | 43 | 2015 |
Offsite HUB (Scotland): Establishing a collaborative regional framework for knowledge exchange in the UK R Hairstans, RE Smith Architectural engineering and design management 14 (1-2), 60-77, 2018 | 39 | 2018 |
Prefab housing and the future of building: product to process M Aitchison, TB Tabrizi, A Beim, R Couper, R Doe, D Engström, ... Lund Humphries 29 (2), 2018 | 39 | 2018 |
History of prefabrication: A cultural survey RE Smith Third International Congress on Construction History, Brandenburg University …, 2009 | 36 | 2009 |
Evaluation of performance modelling: optimizing simulation tools to stages of architectural design MN Hamedani, RE Smith Procedia Engineering 118, 774-780, 2015 | 32 | 2015 |
Solid timber construction: Process, practice, performance RE Smith, G Griffin, T Rice Report sponsored by American Institute of Architects, USDA Forest Products …, 2015 | 30 | 2015 |
Editorial: Lean and integrated project delivery special issue RE Smith, A Mossman, S Emmitt Lean Construction Journal, 1-16, 2011 | 28 | 2011 |
Interlocking Cross-Laminated Timber: alternative use of waste wood in design and construction RE Smith BTES conference, 2011 | 27 | 2011 |
Prefabrication in developing countries: a case study of India R Smith, S Narayanamurthy Wood structures symposium, 5, 2009 | 24 | 2009 |
Building systems: design technology and society K Moe, RE Smith (No Title), 2012 | 21 | 2012 |
Permanent modular construction: Construction performance RE Smith, T Rice Offsite Architecture, 109-127, 2017 | 17 | 2017 |
Feasibility of cross-laminated timber production from UK Sitka Spruce. D Crawford, R Hairstans, RE Smith | 17 | 2013 |
Leading collaborative architectural practice E Carraher, RE Smith John Wiley & Sons, 2017 | 16 | 2017 |
Prefab Architecture: A Guide to Modular design and construction ES Ryan John Wiley and Sons, Inc., Hoboken, New Jersey, 2010 | 15 | 2010 |
Prefab architecture: a guide for architects and construction professionals RE Smith John Wiley & Sons, 2010 | 14 | 2010 |