Finding causal paths between safety management system factors and accident precursors E Pereira, S Ahn, SU Han, S Abourizk Journal of Management in Engineering 36 (2), 04019049, 2020 | 54 | 2020 |
Identification and association of high-priority safety management system factors and accident precursors for proactive safety assessment and control E Pereira, S Ahn, SU Han, S Abourizk Journal of Management in Engineering 34 (1), 04017041, 2018 | 49 | 2018 |
Case-based reasoning approach for assessing safety performance using safety-related measures E Pereira, U Hermann, SU Han, S AbouRizk Journal of Construction Engineering and Management 144 (9), 04018088, 2018 | 29 | 2018 |
Integrating case-based reasoning and simulation modeling for testing strategies to control safety performance E Pereira, SU Han, S AbouRizk Journal of Computing in Civil Engineering 32 (6), 04018047, 2018 | 25 | 2018 |
Distributed simulation–based analytics approach for enhancing safety management systems in industrial construction E Pereira, M Ali, L Wu, S Abourizk Journal of construction engineering and management 146 (1), 04019091, 2020 | 20 | 2020 |
Fatores associados ao atraso na entrega de edifícios residenciais ESS PEREIRA Florianópolis, SC, Brasil: Universidade Federal de Santa Cantarina, 2012 | 16* | 2012 |
Empirical testing for use of safety related measures at the organizational level to assess and control the on-site risk level E Pereira, SU Han, S AbouRizk, U Hermann Journal of Construction Engineering and Management 143 (6), 05017004, 2017 | 13 | 2017 |
Leading safety indicators: Application of machine learning for safety performance measurement P Jafari, E Mohamed, E Pereira, S Kang, S AbouRizk ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2019 | 11 | 2019 |
A conceptual accident causation model based on the incident root causes. 5th International E Pereira, H Taghaddos, R Hermann, S Han, S Abourizk 11th Construction Specialty Conference, 2015 | 11* | 2015 |
Leading indicators for safety management: Understanding the impact of project performance data on safety performance E Mohamed, P Jafari, SC Kang, E Pereira, S AbouRizk Proc., Canadian Society for Civil Engineering, 2019, Montreal, Canada, 2019 | 5 | 2019 |
Framework for BIM-Based Simulation of Construction Operations Implemented in a Game Engine CA Osorio-Sandoval, W Tizani, E Pereira, J Ninić, C Koch Buildings 12 (8), 1199, 2022 | 4 | 2022 |
Teaching construction project planning and control using a management game approach E Pereira, N Thom Canadian Society of Civil Engineering Annual Conference, 59-69, 2021 | 4 | 2021 |
Causas do atraso na entrega de edifícios residenciais E PEREIRA, CN MUTTI, AE JUNGLES, DM ELY ENCUENTRO LATINO-AMERICANO DE GESTIÓN Y ECONOMÍA DE LA CONSTRUCCIÓN 4, 2011 | 4 | 2011 |
Discrete-event simulation and building information modelling based animation of construction activities CA Osorio-Sandoval, W Tizani, E Pereira, C Koch, A Fadoul International Conference on Computing in Civil and Building Engineering, 285-294, 2020 | 3 | 2020 |
Guidance to safety-centric construction acceleration planning in the context of project time-cost tradeoff analysis S Mahdavian, KS Bellale Manjunatha, E Pereira, M Lu Construction Research Congress 2020, 1186-1193, 2020 | 3 | 2020 |
Web-based job hazard assessment for improved safety-knowledge management in construction E Mohamed, P Jafari, E Pereira, S Hague, S AbouRizk, R Wales Proceedings of the 36th International Symposium on Automation and Robotics …, 2019 | 2 | 2019 |
Constructive alignment in a graduate-level project management course: an innovative framework using large language models E Pereira, S Nsair, LR Pereira, K Grant International Journal of Educational Technology in Higher Education 21 (1), 25, 2024 | 1 | 2024 |
A comprehensive systematic review of safety leading indicators in construction H Golabchi, AD Abellanosa, L Lefsrud, E Pereira, Y Mohamed Safety science 172, 106433, 2024 | 1 | 2024 |
A Data-Driven Approach for Deploying Safety Policies for Schedule Planning in Industrial Construction Projects: A Case Study M Taghaddos, E Pereira, C Osorio-Sandoval, U Hermann, S AbouRizk Journal of Construction Engineering and Management 149 (12), 05023013, 2023 | 1 | 2023 |
Application framework for safety-centric construction acceleration planning S Mahdavian, M Lu, E Pereira Engineering, Construction and Architectural Management 30 (4), 1401-1422, 2023 | 1 | 2023 |