关注
Christophe Varnier
Christophe Varnier
ENSMM - FEMTO-ST institute
在 ens2m.fr 的电子邮件经过验证
标题
引用次数
引用次数
年份
PRONOSTIA: An experimental platform for bearings accelerated degradation tests.
P Nectoux, R Gouriveau, K Medjaher, E Ramasso, B Chebel-Morello, ...
IEEE International Conference on Prognostics and Health Management, PHM'12., 1-8, 2012
11852012
Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness
M Sbihi, C Varnier
Computers & Industrial Engineering 55 (4), 830-840, 2008
1182008
Decision process to manage useful life of multi-stacks fuel cell systems under service constraint
N Herr, JM Nicod, C Varnier, L Jardin, A Sorrentino, D Hissel, MC Péra
Renewable energy 105, 590-600, 2017
752017
Resolution of the cyclic multi-hoists scheduling problem with overlapping partitions
C Varnier, A Bachelu, P Baptiste
INFOR: Information Systems and Operational Research 35 (4), 309-324, 1997
751997
Datazero: Datacenter with zero emission and robust management using renewable energy
JM Pierson, G Baudic, S Caux, B Celik, G Da Costa, L Grange, M Haddad, ...
IEEE Access 7, 103209-103230, 2019
702019
Hoist scheduling problem: an approach based on constraint logic programming
P Baptiste, B Legeard, C Varnier
Proceedings 1992 IEEE international conference on robotics and automation …, 1992
591992
Constraint-based model for the cyclic multi-hoists scheduling problem
M Manier, C Varnier, P Baptiste
Production Planning & Control 11 (3), 244-257, 2000
532000
A survey of breast cancer screening techniques: thermography and electrical impedance tomography
J Zuluaga-Gomez, N Zerhouni, Z Al Masry, C Devalland, C Varnier
Journal of medical engineering & technology 43 (5), 305-322, 2019
462019
Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: a resolution with sequential and integrated strategies
F Benbouzid-Sitayeb, SA Guebli, Y Bessadi, C Varnier, N Zerhouni
International Journal of Manufacturing Research 6 (1), 30-48, 2011
462011
Proactive, dynamic and multi-criteria scheduling of maintenance activities
F Marmier, C Varnier, N Zerhouni
International Journal of Production Research 47 (8), 2185-2201, 2009
412009
A hybrid of variable neighbor search and fuzzy logic for the permutation flowshop scheduling problem with predictive maintenance
A Ladj, FBS Tayeb, C Varnier, AA Dridi, N Selmane
Procedia Computer Science 112, 663-672, 2017
372017
A decison-making approach for job shop scheduling with job depending degradation and predictive maintenance
C Fitouri, N Fnaiech, C Varnier, F Fnaiech, N Zerhouni
IFAC-PapersOnLine 49 (12), 1490-1495, 2016
362016
From prognostics and health systems management to predictive maintenance 2: knowledge, reliability and decision
B Chebel-Morello, JM Nicod, C Varnier
John Wiley & Sons, 2017
342017
Scheduling predictive maintenance in flow-shop
C Varnier, N Zerhouni
Proceedings of the IEEE 2012 Prognostics and System Health Management …, 2012
332012
Heuristics for scheduling maintenance and production on a single machine
J Kaabi, C Varnier, N Zerhoni
IEEE International Conference on Systems, Man and Cybernetics 5, 5 pp. vol. 5, 2002
332002
IPro-GA: an integrated prognostic based GA for scheduling jobs and predictive maintenance in a single multifunctional machine
A Ladj, C Varnier, FBS Tayeb
IFAC-PapersOnLine 49 (12), 1821-1826, 2016
322016
Resolution of joint maintenance/production scheduling by sequential and integrated strategies
F Benbouzid, C Varnier, N Zerhouni
Artificial Neural Nets Problem Solving Methods: 7th International Work …, 2003
322003
Health monitoring approach of bearing: application of adaptive neuro fuzzy inference system (ANFIS) for RUL-estimation and Autogram analysis for fault-localization
F Gougam, C Rahmoune, D Benazzouz, C Varnier, JM Nicod
2020 prognostics and health management conference (phm-besançon), 200-206, 2020
272020
Prognostics-based scheduling in a distributed platform: Model, complexity and resolution
N Herr, JM Nicod, C Varnier
2014 IEEE international conference on automation science and engineering …, 2014
262014
Optimization with constraint logic programming: the hoist scheduling problem solved with various solvers
P Baptiste, B Legeard, MA Manier, C Varnier
WIT Transactions on Information and Communication Technologies 1, 1970
251970
系统目前无法执行此操作,请稍后再试。
文章 1–20