关注
Yuanjie Tang
Yuanjie Tang
在 bjtu.edu.cn 的电子邮件经过验证
标题
引用次数
引用次数
年份
Schedule control model for linear projects based on linear scheduling method and constraint programming
Y Tang, R Liu, Q Sun
Automation in construction 37, 22-37, 2014
712014
Scheduling optimization of linear schedule with constraint programming
Y Tang, R Liu, F Wang, Q Sun, AA Kandil
Computer‐Aided Civil and Infrastructure Engineering 33 (2), 124-151, 2018
552018
Two-stage scheduling model for resource leveling of linear projects
Y Tang, R Liu, Q Sun
Journal of Construction Engineering and Management 140 (7), 04014022, 2014
472014
Resource leveling based on line of balance and constraint programming
Y Tang, Q Sun, R Liu, F Wang
Computer‐Aided Civil and Infrastructure Engineering 33 (10), 864-884, 2018
312018
Expressway project cost estimation with a convolutional neural network model
X Xue, Y Jia, Y Tang
IEEE Access 8, 217848-217866, 2020
192020
Segment‐condition‐based railway track maintenance schedule optimization
Y Chang, R Liu, Y Tang
Computer‐Aided Civil and Infrastructure Engineering 38 (2), 160-193, 2023
132023
Float-based resource leveling optimization of linear projects
Z Wang, Z Hu, Y Tang
IEEE Access 8, 176997-177020, 2020
112020
Production rate determination for linear construction projects based on linear scheduling method
L Liu, Y Liu, Y Tang
International Journal of Smart Home 10 (4), 143-152, 2016
102016
Scenario‐oriented repetitive project scheduling optimization
Z Hu, F Wang, Y Tang
Computer‐Aided Civil and Infrastructure Engineering 38 (10), 1239-1273, 2023
82023
Development of metro track geometry fault diagnosis convolutional neural network model based on car-body vibration data
Z Wang, R Liu, F Wang, Y Tang
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2022
62022
National Economic Benefits of Railway Transportation Analyzed Using Data Mining
X Xue, Y Jia, Y Tang
Transportation Research Record 2677 (5), 870-892, 2023
52023
Study on duration calculate model of railway construction based on LSM
L Liu, Y Liu, Y Tang
2015 International Conference on Logistics, Informatics and Service Sciences …, 2015
42015
Study and application on china railway construction project scheduling model based on resource leveling
Y Tang, R Liu, Q Sun
LTLGB 2012: Proceedings of International Conference on Low-carbon …, 2013
32013
Research on railway tunnel construction scheduling technique based on LSM
L Liu, Y Liu, Y Tang, Q Li
LTLGB 2012: Proceedings of International Conference on Low-carbon …, 2013
22013
Heterogeneity‐oriented ensemble learning for rail monitoring based on vehicle‐body vibration
Y Zhuang, R Liu, Y Tang
Computer‐Aided Civil and Infrastructure Engineering 39 (12), 1766-1794, 2024
12024
Linear Project-Scheduling Optimization Considering a Reverse Construction Scenario
Z Yu, C Wang, Y Zhao, Z Hu, Y Tang
Applied Sciences 13 (16), 9407, 2023
12023
Metro Track Geometry Defect Identification Model Based on Car-Body Vibration Data and Differentiable Architecture Search
Z Wang, R Liu, Y Gao, Y Tang
Applied Sciences 13 (6), 3457, 2023
12023
Minimizing durations in repetitive projects through adaptive large neighborhood search
Z Hu, F Wang, Y Tang, Z Wang, Z Yu
Computers & Industrial Engineering, 110751, 2024
2024
Semiautomated Railway Line Information Modeling Based on Asset Management Data
P Li, Y Tang, Z Zheng, Z Wang, Y Zhuang
Journal of Construction Engineering and Management 150 (10), 04024130, 2024
2024
Large Language Model and Application for Railway Track Management Based on Domain Specialization
Y Song, Y Tang, R Liu
International Conference on Traffic and Transportation Studies, 194-204, 2024
2024
系统目前无法执行此操作,请稍后再试。
文章 1–20