关注
Bassem Bouslah
Bassem Bouslah
Pratt & Whitney Canada
在 polymtl.ca 的电子邮件经过验证
标题
引用次数
引用次数
年份
Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint
B Bouslah, A Gharbi, R Pellerin
Omega 61, 110-126, 2016
1532016
Joint production, quality and maintenance control of a two-machine line subject to operation-dependent and quality-dependent failures
B Bouslah, A Gharbi, R Pellerin
International Journal of Production Economics 195, 210-226, 2018
1202018
Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system
B Bouslah, A Gharbi, R Pellerin
International Journal of Production Economics 144 (1), 143-156, 2013
882013
Joint economic design of production, continuous sampling inspection and preventive maintenance of a deteriorating production system
B Bouslah, A Gharbi, R Pellerin
International Journal of Production Economics 173, 184-198, 2016
592016
Joint production and quality control of unreliable batch manufacturing systems with rectifying inspection
B Bouslah, A Gharbi, R Pellerin
International Journal of Production Research 52 (14), 4103-4117, 2014
412014
Optimal production control policy in unreliable batch processing manufacturing systems with transportation delay
B Bouslah, A Gharbi, R Pellerin, A Hajji
International Journal of Production Research 51 (1), 264-280, 2013
372013
Conception conjointe des politiques de contrôle de production, de qualité et de maintenance des systèmes manufacturiers en dégradation
B Bouslah
École Polytechnique de Montréal, 2015
22015
Optimal joint production, maintenance and quality control for a single machine with random failures using Matlab/Simulink optimization-simulation
AA El Cadi, A Gharbi, B Bouslah, A Artiba
7th International Conference on Industrial Engineering and Systems …, 2017
12017
Contrôle de la production et de la qualité des systèmes manufacturiers non-fiables
B Bouslah
Ecole Polytechnique, Montreal (Canada), 2012
2012
A simulation-based optimization approach for an integrated production and quality control model
B Bouslah, R Pellerin, A Gharbi
2012
Lots économique de production et contrôle des systèmes manufacturiers non-fiables avec inspection rectifiante
B Bouslah, A Gharbi, R Pellerin
2011
CIGI 2011 Lot économique de production et contrôle des systèmes manufacturiers non-fiables avec inspection rectifiante
B Bouslah, A Gharbi, R Pellerin
CIGI 2013 Intégration de la production, de la maintenance préventive conditionnelle et du contrôle de la qualité des systèmes manufacturiers en dégradation
B BOUSLAH
系统目前无法执行此操作,请稍后再试。
文章 1–13