Process improvement in healthcare: Overall resource efficiency J de Mast, B Kemper, RJMM Does, M Mandjes, Y van der Bijl Quality and Reliability Engineering International 27 (8), 1095-1106, 2011 | 98 | 2011 |
A computational approach to optimized appointment scheduling A Kuiper, B Kemper, M Mandjes Queueing Systems 79, 5-36, 2015 | 66 | 2015 |
A study on how to improve the throughput time of Lean Six Sigma projects in a construction company A van den Bos, B Kemper, V de Waal International journal of lean six sigma 5 (2), 212-226, 2014 | 59 | 2014 |
Optimized appointment scheduling B Kemper, CAJ Klaassen, M Mandjes European Journal of Operational Research 239 (1), 243-255, 2014 | 53 | 2014 |
Principles of exploratory data analysis in problem solving: what can we learn from a well-known case? J de Mast, BPH Kemper Quality Engineering 21 (4), 366-375, 2009 | 41 | 2009 |
Modeling process flow using diagrams B Kemper, J De Mast, M Mandjes Quality and Reliability Engineering International 26 (4), 341-349, 2010 | 39 | 2010 |
Mean sojourn times in two-queue fork-join systems: bounds and approximations B Kemper, M Mandjes OR spectrum 34, 723-742, 2012 | 36 | 2012 |
Generic Lean Six Sigma project definitions in publishing H de Koning, RJMM Does, A Groen, BPH Kemper International Journal of Lean Six Sigma 1 (1), 39-55, 2010 | 32 | 2010 |
Optimal appointment scheduling in continuous time: The lag order approximation method W Vink, A Kuiper, B Kemper, S Bhulai European Journal of Operational Research 240 (1), 213-219, 2015 | 22 | 2015 |
Quality quandaries: Streamlining the path to optimal care for cardiovascular patients M Schoonhoven, BPH Kemper, MI Brilleman, RJMM Does Quality Engineering 23 (4), 388-394, 2011 | 19 | 2011 |
Quality quandaries: deploying operational excellence at a financial service provider J de Mast, BPH Kemper, A Wiltjer, RJMM Does Quality Engineering 25 (3), 298-306, 2013 | 17 | 2013 |
Quality Quandaries∗: The Availability of Infusion Pumps in a Hospital BPH Kemper, M Koopmans, RJMM Does Quality Engineering 21 (4), 471-477, 2009 | 17 | 2009 |
Measurement plans for process flow improvement in services and health care B Kemper, J de Mast Quality Engineering 25 (4), 437-450, 2013 | 11 | 2013 |
Generic Lean Six Sigma project definitions for the construction industry AV Bos, BPH Kemper, JPWV Dongen, MS Krute International Journal of Six Sigma and Competitive Advantage 8 (3-4), 257-273, 2014 | 8 | 2014 |
Quality quandaries: Cost and quality in postal service BPH Kemper, S Koning, TCW Luijben, RJMM Does Quality Engineering 23 (3), 302-308, 2011 | 7 | 2011 |
Approximations for the mean sojourn time in a parallel queue B Kemper, M Mandjes CWI Report PNA-E0901; see, 2009 | 6 | 2009 |
Throughput analysis and simulation-based improvement of baked varnish stacking for automotive electric drives J Stoll, B Kemper, G Lanza 2014 4th International Electric Drives Production Conference (EDPC), 1-6, 2014 | 4 | 2014 |
Utility-based appointment scheduling B Kemper, C Klaassen, M Mandjes IBIS UvA Working Paper. http://www1. fee. uva. nl/pp/bin/1261fulltext. pdf …, 2011 | 4 | 2011 |
Measurement plans for process flow improvement in services and healthcare BPH Kemper, J Mast Quality control and applied statistics 59 (5), 547-550, 2014 | 2 | 2014 |
Lean six sigma in een ziekenhuis: de beschikbaarheid van infuuspompen R Does, B Kemper, M Koopmans Sigma 11 (2), 6-11, 2011 | 2 | 2011 |