关注
Jacobus Daniel van der Walt
Jacobus Daniel van der Walt
其他姓名Daniel van der Walt
Senior Lecturer, University of Canterbury
在 canterbury.ac.nz 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Identification of critical success factors (CSFs) of BIM software selection: A combined approach of FCM and fuzzy DEMATEL
T Patel, H Bapat, D Patel, JD van der Walt
Buildings 11 (7), 311, 2021
272021
A regulatory perspective on safety in design practices in New Zealand
BHW Guo, R Weston, P Jianphinitnan, W Liu, E Scheepbouwer, ...
Safety science 141, 105352, 2021
232021
Differential rutting in Canterbury New Zealand, and its relation to road camber
JD Van Der Walt, E Scheepbouwer, SL Tighe
International Journal of Pavement Engineering 19 (9), 798-804, 2018
112018
When to Engage the Contractor for Pre-Construction Services in New Zealand
JD van der Walt, PS Botha, E Scheepbouwer
Transportation Research Record: Journal of the Transportation Research Board, 2019
102019
Evaluation of the structural capacity of rigid pavements at the network level
M Saleh, JD Van Der Walt
Canadian Journal of Civil Engineering 46 (5), 439-447, 2019
62019
Effective motion sensors and deep learning techniques for unmanned ground vehicle (UGV)-based automated pavement layer change detection in road construction
T Patel, BHW Guo, JD van der Walt, Y Zou
Buildings 13 (1), 5, 2022
52022
Team composition in relational contracting (RC) in large infrastructure projects: a Belbin’s team roles model approach
F Rahmani, C Scott-Young, A Tadayon, JD van der Walt
Engineering, Construction and Architectural Management 29 (5), 2027-2046, 2022
52022
Identification of critical success factors (CSFs) of BIM software selection: A combined approach of FCM and fuzzy DEMATEL. Buildings, 11 (7), 311
T Patel, H Bapat, D Patel, JD van der Walt
52021
Risk Management and the Effects on Project Success
E Scheepbouwer, A Ezz, B Guo, D Van Der Walt
Construction Research Congress 2018, 460-470, 2018
42018
Positioning of travelling vehicles in rural New Zealand on chip sealed roads
JD van der Walt, E Scheepbouwer, NJ West
Journal of Structural Integrity and Maintenance 2 (4), 227-233, 2017
42017
DETERIORATION COST DUE TO CAMBER FOR CHIPSEALED PAVEMENTS OVER GRANULAR BASES
JD van der Walt, E Scheepbouwer, B Pidwerbesky, BHW Guo
Maireinfra, Seoul South Korea., 2017
42017
A case study of PavMD a new tool to identify good performing pavements in New Zealand
JD van der Walt, E Scheepbouwer, B Pidwerbesky, B Guo, M Ferguson, ...
Canadian Journal of Civil Engineering 49 (7), 1140-1150, 2022
32022
Identification of Critical Success Factors (CSFs) of BIM Software Selection: A Combined Approach of FCM and Fuzzy DEMATEL. Buildings 2021, 11, 311
T Patel, H Bapat, D Patel, JD van der Walt
MDPI, 2021
22021
An IOT Prototype to Collect Transverse Vehicle Position Data for Local Roads
Y Li, E Adams-Cook, J Aspin, JD Van Der Walt, E Scheepbouwer, T Patel
International Structural Engineering and Construction, 2022
12022
FACTORS THAT DETERMINE WHEN TO ENGAGE PRE-CONSTRUCTION SERVICES
P Botha, D van der Walt, S Eric
isec-society, 2020
1*2020
How new performance-based contracts add value in maintenance contracts
JD van der Walt E. Scheepbouwer
IABMAS 2018, 2018
1*2018
Reporting the successful timing of pre-construction services in the New Zealand construction industry-development of a visualisation tool
PS Botha, D van der Walt, E Scheepbouwer, PJ Barutha
Proceedings of the Institution of Civil Engineers-Management, Procurement …, 2024
2024
An internet of things prototype to quantify the lateral wheel path distributions of local roads in New Zealand
Y Li, JD van der Walt, E Scheepbouwer, B Guo, T Patel
International Journal of Pavement Engineering 24 (1), 2268797, 2023
2023
Is Maintaining a Train Network in New Zealand Worth the Cost?
E Scheepbouwer, D van der Walt
Engineering Proceedings 36 (1), 54, 2023
2023
Base isolation: Mind the gap
RA Coulson, E Scheepbouwer, JD van der Walt
International Structural Engineering and Construction, 2022
2022
系统目前无法执行此操作,请稍后再试。
文章 1–20