Net present value maximization model for optimum cut-off grade policy of open pit mining operations MWA Asad, E Topal Journal of the Southern African Institute of Mining and Metallurgy 111 (11 …, 2011 | 100 | 2011 |
Cutoff grade optimization algorithm with stockpiling option for open pit mining operations of two economic minerals MWA Asad International Journal of Surface Mining, Reclamation and Environment 19 (3 …, 2005 | 99 | 2005 |
Optimum cut‐off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation MWA Asad Engineering Computations 24 (7), 723-736, 2007 | 96 | 2007 |
Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand MWA Asad, R Dimitrakopoulos Journal of the Operational Research Society 64 (2), 185-197, 2013 | 95 | 2013 |
A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams MWA Asad, R Dimitrakopoulos Resources Policy 38 (4), 591-597, 2013 | 72 | 2013 |
A review of cut-off grade policy models for open pit mining operations MWA Asad, MA Qureshi, H Jang Resources Policy 49, 142-152, 2016 | 64 | 2016 |
Production phase and ultimate pit limit design under commodity price uncertainty S Chatterjee, MR Sethi, MWA Asad European Journal of Operational Research 248 (2), 658-667, 2016 | 64 | 2016 |
A heuristic approach to optimal design of an underground mine stope layout DSS Sandanayake, E Topal, MWA Asad Applied Soft Computing 30, 595-603, 2015 | 58 | 2015 |
Simultaneous stochastic optimization of production sequence and dynamic cut-off grades in an open pit mining operation A Paithankar, S Chatterjee, R Goodfellow, MWA Asad Resources Policy 66, 101634, 2020 | 50 | 2020 |
Designing an optimal stope layout for underground mining based on a heuristic algorithm DSS Sandanayake, E Topal, MWA Asad International Journal of Mining Science and Technology 25 (5), 767-772, 2015 | 48 | 2015 |
Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles MWA Asad, R Dimitrakopoulos Resources policy 37 (1), 81-89, 2012 | 43 | 2012 |
A new model for open-pit production and waste-dump scheduling Z Fu, MWA Asad, E Topal Engineering Optimization 51 (4), 718-732, 2019 | 42 | 2019 |
Review of solution methodologies for open pit mine production scheduling problem K Fathollahzadeh, MWA Asad, E Mardaneh, M Cigla International Journal of Mining, Reclamation and Environment 35 (8), 564-599, 2021 | 32 | 2021 |
Stochastic production phase design for an open pit mining complex with multiple processing streams MWA Asad, R Dimitrakopoulos, J Eldert Engineering Optimization 46 (8), 1139-1152, 2014 | 32 | 2014 |
A mixed-integer linear programming (MILP) model for short-range production scheduling of cement quarry operations SU Rehman, MWA Asad Asia-Pacific journal of operational research 27 (03), 315-333, 2010 | 32 | 2010 |
A mathematical model for open pit mine production scheduling with Grade Engineering® and stockpiling K Fathollahzadeh, E Mardaneh, M Cigla, MWA Asad International Journal of Mining Science and Technology 31 (4), 717-728, 2021 | 30 | 2021 |
Khan, G. u., Asif, MU, & Aftab, U.(2021). Sequential mediation of innovativeness and competitive advantage between resources for business model innovation and SMEs performance AA Khan, M Asad 2021 International Conference on Decision Aid Sciences and Application (DASA …, 0 | 29 | |
A review of machine learning applications for underground mine planning and scheduling P Chimunhu, E Topal, AD Ajak, W Asad Resources Policy 77, 102693, 2022 | 28 | 2022 |
A mathematical programming model for optimal cut-off grade policy in open pit mining operations with multiple processing streams A Khan, MWA Asad International Journal of Mining, Reclamation and Environment 34 (3), 149-158, 2020 | 27 | 2020 |
A heuristic approach to long-range production planning of cement quarry operations MWA Asad Production Planning & Control 22 (4), 353-364, 2011 | 27 | 2011 |