关注
Zhanat Sultanbekova
Zhanat Sultanbekova
satbayev university
在 satbayev.university 的电子邮件经过验证
标题
引用次数
引用次数
年份
Method of optimizing cyclic and continuous technology complexes location during finalization of mining deep ore open pit mines
S Moldabayev, Z Sultanbekova, A Adamchuk, N Sarybayev
International Multidisciplinary Scientific GeoConference: SGEM 19 (1.3), 407-414, 2019
302019
Probabilistic assessment of slope stability at ore mining with steep layers in deep open pits
O Sdvyzhkova, S Moldabayev, A Başçetin, D Babets, E Kuldeyev, ...
Mining of Mineral Deposits 16 (4), 2022
262022
Methodological approach to creation of the 3D model of an oval-shaped open pit mine
S Moldabayev, B Rysbaiuly, Z Sultanbekova, N Sarybayev
E3S Web of Conferences 123, 01049, 2019
152019
Justification of transfer parameters in conditions of deep zone development of iron ore surface mines
SK Moldabayev, OO Shustov, AA Adamchuk, ZZ Sultanbekova
Recommended for publication by the Scientific Research Council of the Uni …, 2019
82019
Management reserves of mining operations mode in open pit mining of steeply dipping mineral occurences
S Moldabayev, Z Sultanbekova, A Toktarov
International Multidisciplinary Scientific GeoConference: SGEM 17 (1.3), 519-528, 2017
52017
Justification of Countours Belonging to the Stages of Mining Steeply Dipping Deposits Using the Solution of the Problem of Nonlinear Programming
SK Moldabayev, B Rysbaiuly, ZZ Sultanbekova
Mine Planning and Equipment Selection: Proceedings of the 22nd MPES …, 2014
52014
Risks study during implementation of combined transport on ore open pit mines
Z Sultanbekova, A Tsekhovoy, S Moldabayev, N Sarybayev
International Multidisciplinary Scientific GeoConference: SGEM 20 (1.2), 259-266, 2020
42020
Dynamic model of new order of working zone forming realization on steep boards of oval form quarries
S Moldabayev, B Rysbayuly, Z Sultanbekova, Y Aben, N Sarybayev
6th International Conference on Computer Applications in the Minerals …, 2016
42016
PROVISION OF POSSIBILITY OF CONSTRUCTING CONVEYOR HOIST IN A STATIONARY POSITION DURING DEVELOPEMNT OF A WORKING ZONE ON STEEP PIT EDGES OF AN OPEN-PIT MINE
S Moldbayev, Z Sultanbekova, A Toktarov, N Sarybayev
International Multidisciplinary Scientific GeoConference: SGEM 17 (1.3), 693-699, 2017
12017
The impact of project management maturity on the choice of SME growth strategies: the case of Kazakhstan
A Tsekhovoy, Z Sultanbekova, A Stepanov, L Statsenko
International Journal of Business Innovation and Research 34 (5), 1-30, 2024
2024
FEATURES OF OPTIMIZING THE CALENDAR SCHEDULE OF OPEN-PIT MINING BY STEEPLY INCLINED LAYERS
S Moldabayev, Z Sultanbekova, M Sarybayev, T Adil, M Akhmetova
International Multidisciplinary Scientific GeoConference: SGEM 22 (1.1), 281-288, 2022
2022
Optimization of mining schedule during safe development of working zones along steeply inclined open pit edges
SK Moldabayev, ZZ Sultanbekova, KB Rysbekov
系统目前无法执行此操作,请稍后再试。
文章 1–12