Optimizing postdisaster reconstruction planning for damaged transportation networks W Orabi, K El-Rayes, AB Senouci, H Al-Derham Journal of Construction Engineering and Management 135 (10), 1039-1048, 2009 | 103 | 2009 |
Optimizing resource utilization during the recovery of civil infrastructure systems W Orabi, AB Senouci, K El-Rayes, H Al-Derham Journal of management in engineering 26 (4), 237-246, 2010 | 85 | 2010 |
Efficient optimization of post-disaster reconstruction of transportation networks O El-Anwar, J Ye, W Orabi Journal of Computing in Civil Engineering 30 (3), 04015047, 2016 | 38 | 2016 |
Multi-criteria evaluation framework in selection of Accelerated Bridge Construction (ABC) method J Jia, M Ibrahim, M Hadi, W Orabi, Y Xiao Sustainability 10 (11), 4059, 2018 | 23 | 2018 |
Optimizing the rehabilitation efforts of aging transportation networks W Orabi, K El-Rayes Journal of Construction Engineering and Management 138 (4), 529-539, 2012 | 23 | 2012 |
Eye-tracking technology for construction safety: A feasibility study R Pinheiro, N Pradhananga, R Jianu, W Orabi ISARC 2016-33rd International Symposium on Automation and Robotics in …, 2016 | 18 | 2016 |
Minimizing greenhouse gas emissions from construction activities and processes W Orabi, Y Zhu, G Ozcan-Deniz Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012 | 18 | 2012 |
Analysis of time, cost, and environmental impact relationships at the building-material level P Inyim, Y Zhu, W Orabi Journal of Management in Engineering 32 (4), 04016005, 2016 | 17 | 2016 |
Innovative linear formulation for transportation reconstruction planning O El-Anwar, J Ye, W Orabi Journal of Computing in Civil Engineering 30 (3), 04015048, 2016 | 16 | 2016 |
Risk identification and response methods in the egyptian construction industry: Views of large scale contractors WMOA Orabi American University in Cairo, 2003 | 11 | 2003 |
Estimation of the total cost of bridge construction for use in accelerated bridge construction selection decisions J Jia, M Ibrahim, M Hadi, W Orabi, M Ali, Y Xiao Transportation Research Board 95th Annual MeetingTransportation Research Board, 2016 | 10 | 2016 |
Planning post-disaster reconstruction efforts of damaged transportation networks W Orabi, K El-Rayes, A Senouci, H Al-Derham Construction Research Congress 2009: Building a Sustainable Future, 1145-1153, 2009 | 10 | 2009 |
Risk identification and response methods: Views of large scale contractors working in developing countries A Samer Ezeldin, W Orabi Advances in Engineering Structures, Mechanics & Construction, 781-792, 2006 | 10 | 2006 |
Efficient analysis and optimization of reconstruction plans for damaged transportation networks following disasters O El-Anwar, J Ye, W Orabi Computing in civil engineering (2013), 354-362, 2013 | 7 | 2013 |
Estimating the construction cost of accelerated bridge construction (ABC) W Orabi, A Mostafavidarani, M Ibrahim Miami, FL: ABC-UTC, 2016 | 6 | 2016 |
Effectiveness of stationary police vehicles with blue lights in freeway work zones A Gan, W Wu, W Orabi, P Alluri Florida. Dept. of Transportation. Research Center, 2018 | 5 | 2018 |
Estimating total cost of bridge construction using Accelerated Bridge Construction (ABC) and conventional methods of construction M Hadi, W Orabi, Y Xiao, J Jia Accelerated Bridge Construction–University Transportation Center, 2016 | 4 | 2016 |
Optimizing highway reconstruction and rehabilitation projects W Orabi University of Illinois at Urbana-Champaign, 2010 | 4 | 2010 |
Quantifying the impact of I/D contracting on the time/cost trade-off for pavement rehabilitation projects M Ibrahim, W Orabi Construction Research Congress 2016, 679-688, 2016 | 3 | 2016 |
Optimizing Highway Rehabilitation Decisions to Minimize Fuel Consumption in Transportation Networks C Limsawasd, W Orabi, N Athigakunagorn Construction Research Congress 2016, 1588-1598, 2016 | 2 | 2016 |