A hybrid data mining/simulation approach for modelling outpatient no-shows in clinic scheduling KJ Glowacka, RM Henry, JH May Journal of the Operational Research Society 60 (8), 1056-1068, 2009 | 140 | 2009 |
Sense and avoid for small unmanned aircraft systems: Research on methods and best practices M Skowron, W Chmielowiec, K Glowacka, M Krupa, A Srebro Proceedings of the Institution of Mechanical Engineers, Part G: Journal of …, 2019 | 36 | 2019 |
Hierarchical approach for survivable network design A Balakrishnan, M Banciu, K Glowacka, P Mirchandani European Journal of Operational Research 225 (2), 223-235, 2013 | 15 | 2013 |
On prioritizing on-time arrivals in an outpatient clinic KJ Glowacka, JH May, RM Goffman, EK May, AS Milicevic, KL Rodriguez, ... IISE Transactions on Healthcare Systems Engineering 7 (2), 93-106, 2017 | 13 | 2017 |
Managing projects with stochastic durations KJ Glowacka University of Pittsburgh, 2008 | 2 | 2008 |
An Emperical Study of Three Packing Heuristics for Bins with Adjustable Capacity-An Application to Operating Room Scheduling K Glowacka, Y Tjader 35th Annual Meeting of the Decision Sciences Institute, 2004 | 1 | 2004 |
Benefits of contractual time incentives in container shipping industry: a preliminary study K Glowacka Proceedings of the 2015 Winter Simulation Conference, 1984-1995, 2015 | | 2015 |
The Impact of Nonagility on Service Level and Project Duration KJ Glowacka, TJ Lowe, RE Wendell Decision Sciences 43 (5), 957-971, 2012 | | 2012 |