Identifying risk issues and research advancements in supply chain risk management O Tang, SN Musa International journal of production economics 133 (1), 25-34, 2011 | 1372 | 2011 |
Supply chain collaboration for sustainability: A literature review and future research agenda L Chen, X Zhao, O Tang, L Price, S Zhang, W Zhu International journal of production economics 194, 73-87, 2017 | 629 | 2017 |
The relationship between disclosures of corporate social performance and financial performance: Evidences from GRI reports in manufacturing industry L Chen, A Feldmann, O Tang International Journal of Production Economics 170, 445-456, 2015 | 380 | 2015 |
Manufacturing facility location and sustainability: A literature review and research agenda L Chen, J Olhager, O Tang International Journal of Production Economics 149, 154-163, 2014 | 303 | 2014 |
Economic lot scheduling problem with returns O Tang, R Teunter Production and Operations Management 15 (4), 488-497, 2006 | 160 | 2006 |
Identifying competitors through comparative relation mining of online reviews in the restaurant industry S Gao, O Tang, H Wang, P Yin International Journal of Hospitality Management 71, 19-32, 2018 | 158 | 2018 |
Applying GRI reports for the investigation of environmental management practices and company performance in Sweden, China and India L Chen, O Tang, A Feldmann Journal of Cleaner Production 98, 36-46, 2015 | 152 | 2015 |
Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing R Teunter, K Kaparis, O Tang European journal of operational research 191 (3), 1241-1253, 2008 | 147 | 2008 |
Motives and barriers of the remanufacturing industry in China S Wei, D Cheng, E Sundin, O Tang Journal of Cleaner Production 94, 340-351, 2015 | 132 | 2015 |
Planning and replanning the master production schedule under demand uncertainty O Tang, RW Grubbström International journal of production economics 78 (3), 323-334, 2002 | 132 | 2002 |
The impact of information transparency on the dynamic behaviour of a hybrid manufacturing/remanufacturing system O Tang, MM Naim* International Journal of Production Research 42 (19), 4135-4152, 2004 | 126 | 2004 |
Core (product) Acquisition Management for remanufacturing: a review S Wei, O Tang, E Sundin Journal of Remanufacturing 5, 1-27, 2015 | 123 | 2015 |
Simulated annealing in lot sizing problems O Tang International Journal of Production Economics 88 (2), 173-181, 2004 | 119 | 2004 |
Dynamic performance of a hybrid inventory system with a Kanban policy in remanufacturing process L Zhou, MM Naim, O Tang, DR Towill Omega 34 (6), 585-598, 2006 | 114 | 2006 |
An overview of input-output analysis applied to production-inventory systems RW Grubbstrom, O Tang Economic Systems Research 12 (1), 3-25, 2000 | 112 | 2000 |
Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns O Tang, RW Grubbström International Journal of Production Economics 93, 285-300, 2005 | 110 | 2005 |
Planned lead time determination in a make-to-order remanufacturing system O Tang, RW Grubbström, S Zanoni International Journal of Production Economics 108 (1-2), 426-435, 2007 | 99 | 2007 |
Dynamic pricing and ordering decision for the perishable food of the supermarket using RFID technology X Liu, O Tang, P Huang Asia Pacific Journal of Marketing and Logistics 20 (1), 7-22, 2008 | 97 | 2008 |
Levelized cost of hydrogen for refueling stations with solar PV and wind in Sweden: On-grid or off-grid? O Tang, J Rehme, P Cerin Energy 241, 122906, 2022 | 90 | 2022 |
The detailed coordination problem in a two-level assembly system with stochastic lead times O Tang, RW Grubbström International journal of production economics 81, 415-429, 2003 | 89 | 2003 |