Review of surface mine slope monitoring techniques KS Osasan, TB Afeni Journal of Mining Science 46, 177-186, 2010 | 76 | 2010 |
Optimization of drilling and blasting operations in an open pit mine—the SOMAIR experience TB Afeni Mining Science and Technology (China) 19 (6), 736-739, 2009 | 63 | 2009 |
Assessment of noise and ground vibration induced during blasting operations in an open pit mine—a case study on Ewekoro limestone quarry, Nigeria TB Afeni, SK Osasan Mining Science and Technology (China) 19 (4), 420-424, 2009 | 61 | 2009 |
Slope monitoring using total station: what are the challenges and how should these be mitigated? TB Afeni, FT Cawood South African Journal of Geomatics 2 (1), 41-53, 2013 | 58 | 2013 |
A comparative study of geometric and geostatistical methods for qualitative reserve estimation of limestone deposit TB Afeni, VO Akeju, AE Aladejare Geoscience Frontiers 12 (1), 243-253, 2021 | 38 | 2021 |
Re-examination of Itakpe iron ore deposit for reserve estimation using geostatistics and artificial neural network techniques TB Afeni, AI Lawal, RA Adeyemi Arabian Journal of Geosciences 13, 1-13, 2020 | 13 | 2020 |
Cost evaluation of producing different aggregate sizes in selected quarries in ondo state nigeria TB Afeni International journal of engineering and advanced technology studies 4 (2), 6-19, 2015 | 12 | 2015 |
An approach to eradicate the effects of atmospheric variations on total station distance measurement in a surface mine environment: The impact of taking measurement through a … TB Afeni | 12 | 2011 |
Assessment of environmental impact of gemstone mining in Ijero-Ekiti, Nigeria T Afeni, F Ibitolu Mining of Mineral Deposits, 2018 | 10 | 2018 |
Communities–company relation in limestone mining region of southwest Nigeria: The ewekoro socio-economic view T Afeni, A Adeogun International Journal of Development and Economic Sustainability 3 (5), 85-98, 2015 | 9 | 2015 |
Investigation of the spatial variability in Oyo-Iwa limestone deposit for quality control VO Akeju, TB Afeni Journal of Engineering Science and Technology 10 (8), 1065-1085, 2015 | 7 | 2015 |
Assessment of the Socio-Economic Impacts of Quarrying and Processing of Limestone at Obajana, Nigeria TB Afeni, FT Cawood, AF Isiaka European Journal of Social Science 6 (4), 56 - 71, 2008 | 7 | 2008 |
Development of efficient empirical models for the prediction of oil well fracture pressure gradient AI Ajibona, BO Taiwo, TB Afeni, VA Akinbinu, O Emmanuel, OB Ogunyemi Daffodil Int. Univ. J. Sci. Technol 17 (2), 2022 | 6 | 2022 |
Evaluation of some ceramic properties of Gadabiu clay deposit (Kwali Area Council, Abuja, Nigeria) RA Osemenam, TB Afeni, VA Alfred, JN Onwualu-John Mining of Mineral Deposits, 2019 | 6 | 2019 |
Assessment of the Socio-Economic Impacts of Quarrying and Processing of Limestone at Obajana, Nigeria TB Afeni, F Cawood, AF Isiaka Euro. J. Soc. Sci., 6 (4): 56 71, 2008 | 6 | 2008 |
Short-term warning and integrity monitoring algorithm for coal mine shaft safety W Jian, X Tan, H Han, TB Afeni Transactions of Nonferrous Metals Society of China 24 (11), 3666-3673, 2014 | 4 | 2014 |
Soft computing applications for optimum rock fragmentation: an advanced overview AI Lawal, B Adebayo, TB Afeni, IA Okewale, EO Ajaka, JO Amigun, ... Geotechnical and Geological Engineering 42 (2), 859-880, 2024 | 3 | 2024 |
Improvement of drill bit-button performance and efficiency during drilling: an application of LSTM model to Nigeria Southwest Mines B Adebayo, BO Taiwo, BT AFENI, AO Raymond, JO Faluyi Journal of Mining and Environment 14 (4), 1121-1139, 2023 | 3 | 2023 |
Application of Queuing Theory to Larfarge Cement Transportation System for Truck/Loader Optimazation TB Afeni, MA Idris, M Usman Aspects Min Miner Sci 2 (1), 2018 | 3 | 2018 |
Total station survey monitoring through an observation window: A systematic error correction to remove the effects of glass properties TB Afeni, FT Cawood South African Journal of Geomatics 5 (2), 120-141, 2016 | 3 | 2016 |