3D Modeling of the cultural heritage: Between opportunity and necessity GV Herman, T Caciora, DC Ilies, A Ilies, A Deac, A Sturza, SM Sonko, ... Journal of Applied Engineering Sciences 10 (1), 27-30, 2020 | 40 | 2020 |
THE INFLUENCE OF DIFFERENT TYPES OF NOISE ON THE VELOCITY UNCERTAINTIES IN GPS TIME SERIES ANALYSIS S NISTOR, AS BUDA Acta Geodynamica et Geomaterialia 13 (4 (184)), 387-394, 2016 | 20 | 2016 |
GPS network noise analysis: a case study of data collected over an 18-month period S Nistor, AS Buda Journal of Spatial Science 61 (2), 427-440, 2016 | 17 | 2016 |
Ambiguity resolution in precise point positioning technique: a case study S Nistor, AS Buda Journal of Applied Engineering Sciences 5 (1), 53-60, 2015 | 16 | 2015 |
Geodata in science-a review of selected scientific fields M Apollo, M Jakubiak, S Nistor, P Lewińska, A Krawczyk, Ł Borowski, ... Acta Scientiarum Polonorum Formatio Circumiectus 22 (2), 2023 | 14 | 2023 |
THE IMPACT OF TROPOSPHERIC MAPPING FUNCTION ON PPP DETERMINATION FOR ONE-MONTH PERIOD. S Nistor, NS Suba, AS Buda Acta Geodynamica et Geomaterialia 17 (2), 2020 | 14 | 2020 |
USING DIFFERENT MAPPING FUNCTION IN GPS PROCESSING FOR REMOTE SENSING THE ATMOSPHERE S Nistor, AS Buda Journal of Applied Engineering Sciences 18 (2), 73-80, 2015 | 14 | 2015 |
Analysis of noise and velocity in GNSS EPN-repro 2 time series S Nistor, NS Suba, K Maciuk, J Kudrys, EI Nastase, A Muntean Remote Sensing 13 (14), 2783, 2021 | 8 | 2021 |
The influence of zenith tropospheric delay on PPP-RTK S Nistor, AS Buda Journal of applied engineering sciences 6 (1), 71-76, 2016 | 8 | 2016 |
GPS processing tools for better impact assessment of earthquakes in Romania EI Nastase, A Muntean, S Nistor, B Grecu, D Tataru Rom. Rep. Phys 72 (2), 707, 2020 | 6 | 2020 |
Assessment of the Forest Health Through Remote Sensing Techniques in Valea Roșie Natura 2000 Site, Bihor County, Romania L Blaga, I Josan, GV Herman, V Grama, S Nistor, NS Suba Journal of Applied Engineering Sciences 9 (2), 207-215, 2019 | 5 | 2019 |
EVALUATION OF THE AMBIGUITY RESOLUTION AND DATA PRODUCTS FROM DIFFERENT ANALYSIS CENTERS ON ZENITH WET DELAY USING PPP METHOD S NISTOR, AS BUDA Acta Geodynamica et Geomaterialia 14 (2 (186)), 205–220, 2017 | 5 | 2017 |
Determination of zenith tropospheric delay and precipitable water vapor using GPS technology S Nistor, AS Buda Modelling in Civil Environmental Engineering 12 (2), 21-26, 2016 | 5 | 2016 |
Scheduling and simulation of VLBI measurements for the determination of Earth orientation parameters S Nistor, AS Buda Journal of Applied Engineering Sciences 5 (1), 61-68, 2015 | 4 | 2015 |
Time series analysis in the presence of coloured noise S Nistor, AS Buda Journal of Applied Engineering Sciences 17 (2), 81-87, 2014 | 4 | 2014 |
Reference clock impact on GNSS clock outliers K Maciuk, S Nistor, I Brusak, P Lewińska, J Kudrys Journal of Applied Geodesy 17 (4), 391-396, 2023 | 3 | 2023 |
HIGH RATE 30 SECONDS VS CLOCK INTERPOLATION IN PRECISE POINT POSITIONING (PPP) S Nistor, AS Buda GEODETSKI VESTNIK 60 (3), 483-494, 2016 | 3 | 2016 |
Velocity component analysis on a GNSS network S Nistor, AS Buda RevCAD Journal of Geodesy and Cadastre 17, 52-59, 2014 | 3* | 2014 |
Implication between Geophysical Events and the Variation of Seasonal Signal Determined in GNSS Position Time Series S Nistor, NS Suba, A El-Mowafy, M Apollo, Z Malkin, EI Nastase, J Kudrys, ... Remote Sensing 13 (17), 3478, 2021 | 2 | 2021 |
Effects of DEM Generating Algorithms on Water Retention Calculations in Polders–A Case Study NS Suba, S Nistor, Ș Suba Journal of Applied Engineering Sciences 7 (2), 63-68, 2017 | 2 | 2017 |