Stakeholders' perspectives on green building rating: A case study in Indonesia MA Berawi, P Miraj, R Windrayani, ARB Berawi Heliyon 5 (3), 2019 | 70 | 2019 |
Optimizing land use allocation of Transit-Oriented Development (TOD) to generate maximum ridership MA Berawi, G Saroji, FA Iskandar, BE Ibrahim, P Miraj, M Sari Sustainability 12 (9), 3798, 2020 | 51 | 2020 |
Enhancing value for money of mega infrastructure projects development using value engineering method MA Berawi, B Susantono, P Miraj, ARB Berawi, HZ Rahman, A Husin Procedia technology 16, 1037-1046, 2014 | 45 | 2014 |
Producing alternative concept for the trans-sumatera toll road project development using location quotient method MA Berawi, TY Zagloel, P Miraj, H Mulyanto Procedia Engineering 171, 265-273, 2017 | 40 | 2017 |
Research trend of dry port studies: a two-decade systematic review P Miraj, MA Berawi, TY Zagloel, M Sari, G Saroji Maritime Policy & Management 48 (4), 563-582, 2021 | 37 | 2021 |
Developing a conceptual design of transit-oriented development to improve urban land use planning MA Berawi, BE Ibrahim, P Miraj Journal of Design and Built Environment 19 (1), 40-48, 2019 | 35 | 2019 |
Developing conceptual design of high speed railways using value engineering method: Creating optimum project benefits P Miraj, Y Abdurachman, E Tobing, A Ivan | 30 | 2015 |
Improving building performance using smart building concept: Benefit cost ratio comparison MA Berawi, P Miraj, MS Sayuti, ARB Berawi AIP Conference Proceedings 1903 (1), 2017 | 29 | 2017 |
Forecasting the land value around commuter rail stations using Hedonic price modeling MA Berawi, N Suwartha, K Kurnia, G Gunawan, P Miraj, ARB Berawi Int. J. Technol 9 (7), 1329-1337, 2018 | 28 | 2018 |
Economic feasibility of green office building: combining life cycle cost analysis and cost–benefit evaluation P Miraj, MA Berawi, SR Utami Building Research & Information 49 (6), 624-638, 2021 | 27 | 2021 |
Impact of rail transit station proximity to commercial property prices: utilizing big data in urban real estate MA Berawi, P Miraj, G Saroji, M Sari Journal of Big Data 7, 1-17, 2020 | 26 | 2020 |
Analysis of life cycle cost and public-private partnership in the development of Walini City as technology park MA Berawi, A Nabila, G Gunawan, P Miraj, HA Rahman, ARB Berawi Int. J. Technol 9 (7), 1469-1479, 2018 | 26 | 2018 |
Investigation of an operation and maintenance framework in the railway industry: a case study of the makassar-parepare HZ Rahman, MA Berawi, B Susantono, P Miraj, JS Petroceany, R Maya International Journal of Technology 9 (3), 2018 | 24 | 2018 |
Designing a smart integrated workspace to improve building energy efficiency: an Indonesian case study MA Berawi, AA Kim, F Naomi, V Basten, P Miraj, LA Medal, M Sari International Journal of Construction Management 23 (3), 410-422, 2023 | 23 | 2023 |
Economic corridor of industrial development in Indonesia MA Berawi, P Miraj, H Sidqi IOP Conference Series: Earth and Environmental Science 109 (1), 012032, 2017 | 23 | 2017 |
Determining the prioritized victim of earthquake disaster using fuzzy logic and decision tree approach MA Berawi, SAO Siahaan, P Miraj, P Leviakangas Transdisciplinary Research and Education Center for Green Technologies …, 2020 | 22 | 2020 |
Prioritizing airport development plan to optimize financial feasibility MA Berawi, B Susantono, P Miraj, F Nurmadinah Aviation 22 (3), 115-128, 2018 | 21 | 2018 |
Towards Self-sufficient Demand in 2030: Analysis of Life-Cycle Cost For Indonesian Energy Infrastructure MA Berawi, P Miraj, ARB Berawi, Silvia, F Darmawan International Journal of Technology 7 (8), 1444-1453, 2016 | 18 | 2016 |
Land value capture modeling in commercial and office areas using a big data approach MA Berawi, N Suwartha, FS Fathiya Salsabila, G Gunawan, ... International Journal of Technology 10 (6), 1150-1150, 2019 | 17 | 2019 |
Exploring public–private partnership scheme in operation and maintenance stage of railway project HZ Rahman, P Miraj, A Andreas Sustainability 11 (22), 6517, 2019 | 17 | 2019 |