关注
Subandiyah Azis
Subandiyah Azis
National Institute of Technology Malang
在 lecturer.itn.ac.id 的电子邮件经过验证
标题
引用次数
引用次数
年份
The Accelerating of Duration and Change of Cost on Construction Project Implementation
R Harjanto, S Azis, S Hidayat
International Journal of Civil Engineering and Technology 10 (01), 825-832, 2019
122019
Analysis of Irrigation Water Requirement for Anticipating Global Climate Change
S Azis
Journal of Basic and Applied Scientific Research ( JBASR ) 1 (10), 1709-1714, 2011
112011
The determination of priority of the construction of irrigation network
S Azis, H Widodo
International Journal of Agricultural Research, Innovation and Technology …, 2016
72016
Economic Feasibility Analysis of Semantok Dam at Ng anjuk-Indonesia
S Azis
Australian Journal of Basic and Applied Sciences, 10 (14), 207-216, 2016
72016
Analisa Faktor- Faktor Kinerja Konsultan Pengawas Yang Berpengaruh Terhadap Waktu dan Mutu Pekerjaan Proyek Peningkatan Jalan di Kabupaten Probolinggo
S Azis, E Hargono, H Yunianti
Jurnal Teknik Sipil INFO MANPRO 7 (2), 38-49, 2016
62016
Efficiency of Irrigation Water Utilization Towards Environmental and Sustainable Plant Patterns and Adapted to Climate Change
S Azis
International Journal of Civil Engineering and Technology 9 (10), 1371-1381, 2018
42018
Prirority Scale Analysis Using Analytical Hierarchy Process (AHP) to Determine Traditional Market Development in Tulungagung District
E Suryani, S Azis, T Iskandar
International Journal of Scientific Engineering and Science 2 (9), 31-37, 2018
42018
Evaluasi Penjadwalan Pembangunan Hanggar PT Gudang Garam Tbk Menggunakan Metode Critical Chain Project Management (Studi Kasus Pembangunan Hanggar PT Gudang Garam Tbk di Warun)
D Supriadi, S Azis, E Hargono
Jurnal Teknik Sipil INFO MANPRO 8 (2), 18-30, 2017
42017
Analysis of Construction Cost Efficiency Between Precast Method and Conventional Method in Building Project
BE Iswahyudi, S Azis, AA Santosa
International Journal of Technology and Sciences (IJTS) 1 (1), 2017
42017
Environmental Drainage Systems in the Sukun District, Malang Indonesia
S Azis
International Journal of Innovations in Engineering and Technology (IJIET) 7 …, 2016
4*2016
Penerapan Rekayasa Nilai (Value Engineering) pada Pekerjaan Struktur Balok dan Kolom Gedung Poliklinik Universitas Brawijaya Malang
S Azis, G Purwanto, T Iskandar
TEMU ILMIAH IPLBI 2016 1 (FTSP-ITN Malang), H121-H128, 2016
42016
Metode Rencana Tata Tanam Global Mengantisipasi Dampak Perubahan Iklim (Studi Kasus Daerah Irigasi Molek Kabupaten Malang)
S Azis
Disertasi tidak diterbitkan. Universitas Brawijaya. Malang, 2011
42011
Risk Management Analysis for Construction of Kutai Kartanegara Bridge-East Kalimantan-Indonesia
S Azis
THE 3RD INTERNATIONAL CONFERENCE ON CONSTRUCTION AND BUILDING ENGINEERING …, 2017
32017
Application of Value Engineering on the Construction of Tertiary Irrigation Channel
S Azis, A Nurdin, E Hargono
Research Journal of Applied Sciences (RJAS) 1 (1), 1328-1333, 2016
32016
Analysis of Factors Affecting Labor Productivity in The Advanced Construction Project of The Kaubun Irrigation Network of Kutai Timur Regency
A Gazali, S Azis
Russian Journal of Agricultural and Socio Economic Sciences 1 (85), 351-357, 2019
2*2019
Financial Feasibility Analysis of Terminal Construction Project at Motaain Checkponit Crossing in Belu Regency
RL Fernandez, S Azis, T Iskandar
International Journal of Scientific Engineering and Science 2 (9), 7-13, 2018
22018
Analytical Hierarchy Process (AHP) To Determine Location Priority Scale For Bridge Widening At Lawang-Malang Road, Indonesia
Kholila, S Azis, T Iskandar
International Journal of Scientific & Technology Research (IJSTR) 11 (6 …, 2017
2*2017
Cost and Time Optimalization on the Implementation of Building Construction Project
YT Prihanto, S Azis, T Iskandar
European Researcher. Series A 8 (3), 212-223, 2017
22017
The Effect of Project Manager Competency on Project Time Performance
S Azis, B Putra
IJEM (International Journal Of Engineering And Management) 1 (1), 15-22, 2017
22017
Analisa Pengaruh Kompetensi Manajer Proyek Terhadap Ketepatan Biaya, Mutu dan Waktu
S Azis, AH Wahyono, Suyadi
Jurnal Teknik Sipil INFO MANPRO 7 (1), 21-33, 2016
22016
系统目前无法执行此操作,请稍后再试。
文章 1–20