关注
Zeynep ISIK
标题
引用次数
引用次数
年份
Impact of corporate strengths/weaknesses on project management competencies
Z Isik, D Arditi, I Dikmen, MT Birgonul
International Journal of Project Management 27 (6), 629-637, 2009
1802009
Impact of resources and strategies on construction company performance
Z Isik, D Arditi, I Dikmen, MT Birgonul
Journal of Management in Engineering 26 (1), 9-18, 2010
1102010
Building information modeling (BIM) use in Turkish construction industry
H Aladag, G Demirdögen, Z Isık
Procedia engineering 161, 174-179, 2016
992016
The effect of stakeholder-associated risks in mega-engineering projects: A case study of a PPP airport project
H Aladağ, Z Işik
IEEE Transactions on Engineering Management 67 (1), 174-186, 2018
772018
Role of financial risks in BOT megatransportation projects in developing countries
H Aladağ, Z Işik
Journal of Management in Engineering 33 (4), 04017007, 2017
532017
An overarching review on delay analyses in construction projects
M Çevikbaş, Z Işık
Buildings 11 (3), 109, 2021
502021
The role of exogenous factors in the strategic performance of construction companies
Z Isik, D Arditi, I Dilmen, M Talat Birgonul
Engineering, Construction and Architectural Management 17 (2), 119-134, 2010
482010
A fuzzy AHP model to assess sustainable performance of the construction industry from urban regeneration perspective
Z Işik, H Aladağ
Journal of civil engineering and management 23 (4), 499-509, 2017
462017
Design and construction risks in BOT type mega transportation projects
H Aladağ, Z Işık
Engineering, Construction and Architectural Management 26 (10), 2223-2242, 2019
412019
Exploring the additional value of class imbalance distributions on interpretable flash flood susceptibility prediction in the Black Warrior River basin, Alabama, United States
Ö Ekmekcioğlu, K Koc, M Özger, Z Işık
Journal of Hydrology 610, 127877, 2022
302022
A multi-agent-based model for sustainable governance of urban flood risk mitigation measures
K Koc, Z Işık
Natural Hazards 104, 1079-1110, 2020
292020
Lean management framework for healthcare facilities integrating BIM, BEPS and big data analytics
G Demirdöğen, Z Işık, Y Arayici
Sustainability 12 (17), 7061, 2020
262020
Lean based maturity framework integrating value, BIM and big data analytics: evidence from AEC industry
G Demirdöğen, NS Diren, H Aladağ, Z Işık
Sustainability 13 (18), 10029, 2021
222021
Developing a probabilistic decision-making model for reinforced sustainable supplier selection
K Koc, Ö Ekmekcioğlu, Z Işık
International Journal of Production Economics 259, 108820, 2023
192023
BIM-based big data analytic system for healthcare facility management
G Demirdöğen, Z Işık, Y Arayici
Journal of Building Engineering 64, 105713, 2023
192023
Assessment of urban flood risk factors using Monte Carlo analytical hierarchy process
K Koc, Z Işık
Natural Hazards Review 22 (4), 04021048, 2021
172021
Facility management information taxonomy framework for queries in healthcare buildings
G Demirdöğen, Z Işık, Y Arayici
Journal of Building Engineering 44, 102510, 2021
142021
New delay-analysis method using modified schedule and modified updated schedule for construction projects
M Çevikbaş, O Okudan, Z Işık
Journal of Construction Engineering and Management 148 (11), 04022119, 2022
122022
İnşaat Sektörünün Yapım Yönetimi Eğitiminden Beklentileri
MT Birgönül, İ Dikmen, B Özorhon, Z Işık
İnşaat Yönetimi Kongresi, İstanbul, 169-179, 2007
122007
Determination of business intelligence and analytics-based healthcare facility management key performance indicators
G Demirdöğen, Z Işık, Y Arayici
Applied Sciences 12 (2), 651, 2022
102022
系统目前无法执行此操作,请稍后再试。
文章 1–20