Development of automatic-extraction model of poisonous clauses in international construction contracts using rule-based NLP J Lee, JS Yi, JW Son Journal of Computing in Civil Engineering 33 (3), 04019003, 2019 | 133 | 2019 |
BIM-integrated construction operation simulation for just-in-time production management WS Jeong, S Chang, JW Son, JS Yi Sustainability 8 (11), 1106, 2016 | 102 | 2016 |
A project manager's level of satisfaction in construction logistics H Jang, JS Russell, JS Yi Canadian Journal of Civil Engineering 30 (6), 1133-1142, 2003 | 86 | 2003 |
Supply chain cost model for prefabricated building material based on time-driven activity-based costing YW Kim, SH Han, JS Yi, SW Chang Canadian Journal of Civil Engineering 43 (4), 287-293, 2016 | 71 | 2016 |
A suggested color scheme for reducing perception-related accidents on construction work sites J Yi, Y Kim, K Kim, B Koo Accident Analysis & Prevention 48, 185-192, 2012 | 66 | 2012 |
Effective risk positioning through automated identification of missing contract conditions from the contractor’s perspective based on FIDIC contract cases JH Lee, Y Ham, JS Yi, JW Son Journal of Management in Engineering 36 (3), 05020003, 2020 | 63 | 2020 |
Predicting project’s uncertainty risk in the bidding process by integrating unstructured text data and structured numerical data using text mining JH Lee, JS Yi Applied Sciences 7 (11), 1141, 2017 | 55 | 2017 |
Construction workers’ awareness of safety information depending on physical and mental load S Kim, H Lee, S Hwang, JS Yi, JW Son Journal of Asian Architecture and Building Engineering 21 (3), 1067-1077, 2022 | 41 | 2022 |
Establishment of growth strategies for international construction firms by exploring diversification-related determinants and their effects YK Sung, JH Lee, JS Yi, JW Son Journal of Management in Engineering 33 (5), 04017018, 2017 | 39 | 2017 |
Environmental impacts comparison between on-site vs. prefabricated Just-In-Time (prefab-JIT) rebar supply in construction projects YW Kim, R Azari-N, JS Yi, J Bae Journal of Civil Engineering and Management 19 (5), 647-655, 2013 | 26 | 2013 |
Unstructured construction data analytics using R programming-focused on overseas construction adjudication cases JH Lee, JS Yi, JW Son Journal of the Architectural Institute of Korea Structure & Construction 32 …, 2016 | 16 | 2016 |
Insulation plan of aluminum curtain wall-fastening unit for high-rise residential complex SY Song, JS Yi, BK Koo Building and Environment 43 (7), 1310-1317, 2008 | 16 | 2008 |
Application of serious games for effective construction safety training JW Son, SW Shin, JS Yi Korean journal of construction engineering and management 15 (1), 20-27, 2014 | 11 | 2014 |
Construction disputes and associated contractual knowledge discovery using unstructured text-heavy data: Legal cases in the United Kingdom JH Lee, Y Ham, JS Yi Sustainability 13 (16), 9403, 2021 | 10 | 2021 |
Classifying the level of bid price volatility based on machine learning with parameters from bid documents as risk factors YE Jang, JW Son, JS Yi Sustainability 13 (7), 3886, 2021 | 10 | 2021 |
The productivity improvement for steel framing work efficiency by work sampling and 5-minute rating technique SW Chang, JS Yi, JW Son Journal of Construction Engineering and Project Management 5 (1), 40-46, 2015 | 10 | 2015 |
Activity-based life cycle analysis of a curtain wall supply for reducing its environmental impact JS Yi, YW Kim, JY Lim, J Lee Energy and Buildings 138, 69-79, 2017 | 9 | 2017 |
BIM-based management system for off-site construction projects YE Jang, JW Son, JS Yi Applied Sciences 12 (19), 9878, 2022 | 7 | 2022 |
Understanding collaborative working processes within construction project teams using agent-based modeling and simulation JW Son, SW Shin, JS Yi Korean Journal of Construction Engineering and Management 15 (1), 70-77, 2014 | 7 | 2014 |
Implementing activity-based LCA model for carbon dioxide emission analysis and allocation of environment cost JY Lim, JS Yi, SW Shin, JW Son Korean Journal of Construction Engineering and Management 13 (4), 78-88, 2012 | 7 | 2012 |