Scheduling a make-to-stock queue: Index policies and hedging points MH Veatch, LM Wein Operations Research 44 (4), 634-647, 1996 | 202 | 1996 |
Optimal control of a two-station tandem production/inventory system MH Veatch, LM Wein Operations Research 42 (2), 337-350, 1994 | 188 | 1994 |
Monotone control of queueing networks MH Veatch, LM Wein Queueing Systems 12, 391-408, 1992 | 86 | 1992 |
Dynamic allocation of reconfigurable resources ina two-stage tandem queueing system with reliability considerations CH Wu, ME Lewis, M Veatch IEEE Transactions on Automatic Control 51 (2), 309-314, 2006 | 62 | 2006 |
Production control with backlog-dependent demand SB Gershwin, B Tan, MH Veatch IIE transactions 41 (6), 511-523, 2009 | 39 | 2009 |
Approximate dynamic programming for networks: Fluid models and constraint reduction MH Veatch preprint, 2005 | 32 | 2005 |
Inspection strategies for multistage production systems with time-varying quality MH Veatch International Journal of Production Research 38 (4), 837-853, 2000 | 26 | 2000 |
Optimal average cost manufacturing flow controllers: Convexity and differentiability MH Veatch, MC Caramanis IEEE transactions on automatic control 44 (4), 779-783, 1999 | 21 | 1999 |
Reliability of periodic, coherent, binary systems MH Veatch IEEE transactions on reliability 35 (5), 504-507, 1986 | 21 | 1986 |
Zero-inventory conditions for a two-part-type make-to-stock production system MH Veatch, F De Véricourt Queueing systems 43, 251-266, 2003 | 20 | 2003 |
Using fluid solutions in dynamic scheduling MH Veatch Analysis and modeling of manufacturing systems, 399-426, 2003 | 19 | 2003 |
Fluid analysis of arrival routing MH Veatch IEEE Transactions on Automatic Control 46 (8), 1254-1257, 2001 | 18 | 2001 |
Optimal manufacturing flow controllers: Zero-inventory policies and control switching sets MH Veatch, MC Caramanis IEEE transactions on automatic control 44 (5), 914-921, 1999 | 18 | 1999 |
Approximate linear programming for average cost MDPs MH Veatch Mathematics of Operations Research 38 (3), 535-544, 2013 | 17 | 2013 |
The impact of customer impatience on production control MH Veatch IIE Transactions 41 (2), 95-102, 2009 | 16 | 2009 |
Approximate linear programming for networks: Average cost bounds MH Veatch Computers & Operations Research 63, 32-45, 2015 | 15 | 2015 |
A c-mu rule for two-tiered parallel servers S Saghafian, MH Veatch IEEE Transactions on Automatic Control 61 (4), 1046-1050, 2015 | 12 | 2015 |
Fluid analysis of an input control problem MH Veatch, JR Senning Queueing Systems 61, 87-112, 2009 | 11 | 2009 |
Feeding the bottleneck: airport congestion during relief operations M Veatch, J Goentzel Journal of Humanitarian Logistics and Supply Chain Management 8 (4), 430-446, 2018 | 9 | 2018 |
Approximate linear programming for network control: Column generation and subproblems MH Veatch, N Walker Dept. Math, Gordon College, Wenham, MA, 2008 | 9 | 2008 |