Reliability analysis of primary and purification pumps in RSG-GAS using Monte Carlo simulation approach E Hartini, H Adrial, S Pujiarta Jurnal Teknologi Reaktor Nuklir Tri Dasa Mega 21 (1), 15-22, 2019 | 18 | 2019 |
Determination of Maintenance Priority Index (MPI) for Components on RSG-Gas Safety System E Hartini, S Dibyo, S Pujiarta Jurnal Teknologi Reaktor Nuklir Tri Dasa Mega 20 (2), 77-88, 2018 | 7 | 2018 |
Analisa Kebutuhan Make Up Water Cooling Tower RSG-GAS pada Daya 30 MW Setelah Revitalisasi P Busono, S Pujiarta Reaktor: Buletin Pengelolaan Reaktor Nuklir 17 (1), 38-44, 2020 | 6 | 2020 |
Evaluation of operating performance of the reactor coolant system of rsg-gas using chemcad6. 1.4 S Dibyo KnE Energy, 45-54, 2016 | 5 | 2016 |
ANALYSIS OF THE INSPECTION RESULTS ON THE PRIMARY COOLING PIPE OF RSG-GAS REACTOR A Hafid SIGMA EPSILON-Buletin Ilmiah Teknologi Keselamatan Reaktor Nuklir 19 (2), 2016 | 3 | 2016 |
Fast Defect Detection on Primary Pump Pipe for RSG-GAS Reactor Using Acoustics Emission Techniques M Yahya, S Pujiarta, S Bakhri, RM Subekti Journal of Physics: Conference Series 1198 (2), 022067, 2019 | 2 | 2019 |
UJI KEMAMPUAN RESIN PENUKAR ION SISTEM PURIFIKASI AIR PENDINGIN PRIMER REAKTOR RSG-GAS MENGGUNAKAN AIR BEKAS PENCUCIAN BATU TOPAS D Erlina, S Budi, S Pujiarta PROSIDING SEMINAR NASIONAL TEKNOLOGI DAN APLIKASI REAKTOR NUKLIR, 72-81, 2014 | 2 | 2014 |
Kajian Pengujian Kebocoran Air Pendingin Reaktor Pada Alat Penukar Panas Reaktor GA. Siwabessy S Pujiarta, JS Jaja Sukmana Buletin" Reaktor", 2013 | 2 | 2013 |
Evaluasi Perawatan Sistem Proses Pendingin Reaktor di RSG-GAS S Pujiarta, BCI Bambang Cony Irawan, B Murjati, H Harsono PROSIDING SEMINAR NASIONAL PRANATA NUKLIR, 2008 | 2 | 2008 |
Pemeliharaan Sistem Pendingin Primer JE-01 di reaktor GA. Siwabessy S Pujiarta, B CONYIRAWAN Seminar Nasional IV, SDM TeknologiNuklir, 25-26, 2008 | 2 | 2008 |
Analisis Kemampuan Resin Penukar Ion pada Sistem Demineralisasi RSG-Gas DE Lestari, S Pujiarta, Irawan Prosiding Seminar Hasil Penelitian P2TRR., 126-131, 2000 | 2 | 2000 |
Evaluasi Ketidaksejajaran Motor Dan Pompa Sistem Pendingin Sekunder Reaktor RSG-GAS (PA-01/02/03 AP001) AM Santosa Pujiarta, AN Said, A Md, M Taufiq, IP Busono, R Royadi Reaktor: Buletin Pengelolaan Reaktor Nuklir 13 (2), 19-27, 2017 | 1 | 2017 |
PERAWATAN DAN PEMERIKSAAN PIPA-PIPA ALAT PENUKAR PANAS JE01 BC02 RSG–GAS S Pujiarta, D Solehudin, S Syafrul, A Saepudin PROSIDING SEMINAR NASIONAL TEKNOLOGI DAN APLIKASI REAKTOR NUKLIR, 157-167, 2013 | 1 | 2013 |
Rancangan modifikasi sistem pemipaan pasokan air menara pendingin RSG-GAS D Hasibuan, S Pujiarta Buletin" Reaktor", 2006 | 1 | 2006 |
Analysis of the causes of the secondary cooling pump vibration PA-02 AP001 B Pranto, P Santosa Buletin Pengelolaan Reaktor Nuklir 18 (1), 40-50, 2021 | | 2021 |
Analysis of needs make up water cooling tower RSG-GAS at 30 MW power after revitalization B Pranto, P Santosa Buletin Pengelolaan Reaktor Nuklir 17 (1), 38-44, 2020 | | 2020 |
Evaluation of mechanical filter treatment (PA-01/02/03 BT001) in RSG-GAS secondary cooling system B Pranto, P Santosa, NS Aji | | 2018 |
Monitoring the condition of pump bearings and secondary cooling motors PA01 AP01 and PA03 AP01 after replacing S Pranto, P Santosa, NS Aji | | 2017 |
Modification design system of waste disposal of liquid activity waste (KPK02) S Edison, P Santosa, S Yulius | | 2017 |
KAJIAN WAKTU TUTUP DAN KEBOCORAN TIGHT DAMPER ISOLATION SA Harahap, S Pujiarta Jurnal Forum Nuklir 7 (1), 18-24, 2017 | | 2017 |