Minimizing tardiness and maintenance costs in flow shop scheduling by a lower-bound-based GA AJ Yu, J Seif Computers & Industrial Engineering 97, 26-40, 2016 | 78 | 2016 |
An integrated support vector regression–imperialist competitive algorithm for reliability estimation of a shearing machine A Azadeh, J Seif, M Sheikhalishahi, M Yazdani International Journal of Computer Integrated Manufacturing 29 (1), 16-24, 2016 | 55 | 2016 |
Component based life cycle costing in replacement decisions J Seif, M Rabbani Journal of Quality in Maintenance Engineering 20 (4), 436-452, 2014 | 45 | 2014 |
Modelling and optimization of a bi-objective flow shop scheduling with diverse maintenance requirements J Seif, AJ Yu, F Rahmanniyay International Journal of Production Research 56 (9), 3204-3225, 2018 | 29 | 2018 |
A multi-objective multi-stage stochastic model for project team formation under uncertainty in time requirements F Rahmanniyay, AJ Yu, J Seif Computers & Industrial Engineering 132, 153-165, 2019 | 28 | 2019 |
Integrated preventive maintenance and flow shop scheduling under uncertainty J Seif, M Dehghanimohammadabadi, AJ Yu Flexible services and manufacturing journal 32, 852-887, 2020 | 24 | 2020 |
An integrated simulation-analysis of variance methodology for effective analysis of CBM alternatives A Azadeh, SM Asadzadeh, J Seif International Journal of Computer Integrated Manufacturing 27 (7), 624-637, 2014 | 17 | 2014 |
An extensive operations and maintenance planning problem with an efficient solution method J Seif, JY Andrew Computers & Operations Research 95, 151-162, 2018 | 16 | 2018 |
Parallel machine replacement under horizon uncertainty J Seif, BA Shields, AJ Yu The Engineering Economist 64 (1), 1-23, 2019 | 6 | 2019 |
Multi-Objective Patient Appointment Scheduling Framework (MO-PASS): a data-table input simulation–optimization approach M Dehghanimohammadabadi, M Rezaeiahari, J Seif Simulation 99 (4), 363-383, 2023 | 3 | 2023 |
A Multidisciplinary Team Formation Problem for Projects in the Aerospace Industry G Asatourian, K Maramot, DM Reyes, J Seif IIE Annual Conference. Proceedings, 914-919, 2021 | 3 | 2021 |
Parallel machine replacement with shipping decisions BA Shields, J Seif, AJ Yu International Journal of Production Economics 218, 62-71, 2019 | 2 | 2019 |
Optimization of Resource Allocation for California Wildfires A Preciado, S Jaworski, L Ta, J Seif IIE Annual Conference. Proceedings, 950-955, 2021 | 1 | 2021 |
Minimizing cost of parallel machine replacement in construction projects with horizon uncertainty J Seif, JY Andrew, BA Shields IIE Annual Conference. Proceedings, 800-805, 2017 | 1 | 2017 |
Optimal Allocation of Campus Parking Spaces to Personal Vehicles: A Case Study C To, S Khakali, J Seif IIE Annual Conference. Proceedings, 1-6, 2022 | | 2022 |
Mission Scheduling Maximization Subject to Aircraft System Reliability and Mission Requirements J Thompson, E Hilario, J Seif IIE Annual Conference. Proceedings, 1052-1057, 2021 | | 2021 |
The Online Resources Shared on Twitter About the# MeToo Movement: The Pareto Principle I Tahamtan, J Seif arXiv preprint arXiv:1906.12321, 2019 | | 2019 |
The Integration of Maintenance Decisions and Flow Shop Scheduling J Seif | | 2018 |
Multi-stage formulation of a multi-depot consultant assignment and routing problem with skill and priority matching AJ Yu, B Shields, J Seif Proceedings of International Conference on Computers and Industrial …, 2017 | | 2017 |
Flexible and Diverse Maintenance Activities in a Single Machine Scheduling Problem J Seif, R Tavakkoli-Moghaddam, M Baghersad Proceedings of the IIE Asian Conference, Singapore, 2012 | | 2012 |