关注
MUHAMMAD FADHIL BIN ABDUL RAHIM
MUHAMMAD FADHIL BIN ABDUL RAHIM
未知所在单位机构
在 student.uitm.edu.my 的电子邮件经过验证
标题
引用次数
引用次数
年份
Barriers and impact of mechanisation and automation in construction to achieve better quality products
SS Kamaruddin, MF Mohammad, R Mahbub
Procedia-Social and Behavioral Sciences 222, 111-120, 2016
982016
Enhancing the quality of life by adopting sustainable modular industrialised building system (IBS) in the Malaysian construction industry
MF Musa, MF Mohammad, R Mahbub, MR Yusof
Procedia-Social and Behavioral Sciences 153, 79-89, 2014
832014
Mechanisation and automation of the IBS construction approach: A Malaysian experience
SS Kamaruddin, MF Mohammad, R Mahbub, K Ahmad
Procedia-Social and Behavioral Sciences 105, 106-114, 2013
522013
Enhancing the quality of construction environment by minimizing the cost variance
SZHS Jamaludin, MF Mohammad, K Ahmad
Procedia-Social and Behavioral Sciences 153, 70-78, 2014
512014
Construction environment: adopting IBS construction approach towards achieving sustainable development
MF Mohammad
Procedia-Social and Behavioral Sciences 85, 8-15, 2013
492013
Supply chain integration in industralised building system in the Malaysian construction industry
AS Abd Shukor, MF Mohammad, R Mahbub, F Ismail
The Built & Human Environment Review 4 (1), 108-121, 2011
492011
Challenges of Building Information Modelling (BIM) from the Malaysian architect’s perspective
KAA Jamal, MF Mohammad, N Hashim, MR Mohamed, MA Ramli
MATEC web of conferences 266, 05003, 2019
482019
Towards the adoption of modular construction and prefabrication in the construction environment: A case study in Malaysia
MF Musa, MR Yusof, MF Mohammad, NS Samsudin
Journal of Engineering and Applied Sciences 11 (13), 8122-8131, 2016
452016
Review in formulating the standard form of contract for Industrialized Building System (IBS) construction approach in Malaysia
MAM Fateh, MF Mohammad, AS Abd Shukor
MATEC Web of Conferences 87, 01001, 2017
332017
The potential application of IBS modular system in the construction of housing scheme in Malaysia
MF Mohammad, AS Baharin, MF Musa, MR Yusof
Procedia-Social and Behavioral Sciences 222, 75-82, 2016
322016
Challenges in the integration of supply chains in IBS project environment in Malaysia
MF Mohammad, AS Abd Shukor, R Mahbub, FM Halil
Procedia-Social and Behavioral Sciences 153, 44-54, 2014
322014
Characteristics of modular construction: meeting the needs of sustainability and innovation
MF Musa, MR Yusof, MF Mohammad, R Mahbub, S Alam, F Com
Colloquium on Humanities, Science and Engineering, 216-221, 2014
312014
The way forward for industrialised building system (IBS) in Malaysia
MF Musa, MF Mohammad, MR Yusof, R Mahbub
InCIEC 2014: Proceedings of the International Civil and Infrastructure …, 2015
302015
Towards improving integration of supply chain in IBS construction project environment
AS Abd Shukor, MF Mohammad, R Mahbub, F Halil
Procedia-Social and Behavioral Sciences 222, 36-45, 2016
272016
Industrialised building system modular system (IBSMS) organisational readiness framework
MF Musa, MF Mohammad, MR Yusof, R Ahmad
Procedia-Social and Behavioral Sciences 222, 83-92, 2016
252016
Industrialized building system (IBS) provision in local and international standard form of contracts
MAM Fateh, MF Mohammad
Journal of Construction in Developing Countries 22 (2), 67-80, 2017
242017
Delay analysis methodologies (DAMs) in delivering quality projects: Contractors and consultants’ perceptions
NH Muhamad, MF Mohammad, AC Ahmad, IH Ibrahim
Procedia-Social and Behavioral Sciences 222, 121-131, 2016
232016
Enhancing the quality of life by adopting IBS: an economic perspective on mechanisation and automation
SS Kamaruddin, MF Mohammad, R Mahbub
Procedia-Social and Behavioral Sciences 101, 71-80, 2013
232013
Supply chain integration challenges in project procurement in Malaysia: IBS contractors' perspective
AA Shukor, MF Mohammad, R Mahbub
Management and Innovation for a Sustainable Built Environment MISBE 2011 …, 2011
17*2011
Procurement strategies for the oil and gas industry: to capture changing values and dealing with multi cultural complexity
MF Mohammad
International Conference on Construction and Building Technology, UNITEN, 29-38, 2008
172008
系统目前无法执行此操作,请稍后再试。
文章 1–20