Lot streaming in a two-stage flow shop with set-up, processing and removal times separated FC Çetinkaya Journal of the Operational Research Society 45 (12), 1445-1455, 1994 | 87 | 1994 |
Unit sized transfer batch scheduling with setup times FC Çetinkaya, MS Kayaligil Computers & industrial engineering 22 (2), 177-183, 1992 | 61 | 1992 |
Unit sized transfer batch scheduling in an automated two-machine flow-line cell with one transport agent FC Cetinkaya The International Journal of Advanced Manufacturing Technology 29, 178-183, 2006 | 20 | 2006 |
LP relaxation-based solution algorithms for the multi-mode project scheduling with a non-renewable resource M Azizoglu, FC Çetinkaya, SK Pamir European Journal of Industrial Engineering 9 (4), 450-469, 2015 | 13 | 2015 |
Flowshop lot streaming to minimize total weighted flow time FC Çetinkaya, JND Gupta Research Memorandum 94, 24, 1994 | 11 | 1994 |
Lot streaming in a two-machine mixed shop FC Çetinkaya, M Duman The International Journal of Advanced Manufacturing Technology 49, 1161-1173, 2010 | 10 | 2010 |
Customer order scheduling with job-based processing on a single-machine to minimize the total completion time FC Çetinkaya, P Yeloğlu, HA Çatmakaş | 8 | 2021 |
A blood distribution problem with new transportation options-an application for the Turkish Red Crescent A Kurt, FC Çetinkaya, M Azizoğlu European Journal of Industrial Engineering 13 (3), 332-367, 2019 | 5 | 2019 |
Solution approaches to the blood distribution problem of the Turkish Red Crescent A Kurt, M Azizoglu, FC Çetinkaya European Journal of Industrial Engineering 12 (3), 405-441, 2018 | 5 | 2018 |
Scheduling with lot streaming in a two-machine re-entrant flow shop FC Çetinkaya, M Duman | 4 | 2021 |
Single-machine scheduling of indivisible multi-operation jobs FC Çetinkaya, HA Çatmakaş, AK Görür South African Journal of Industrial Engineering 30 (1), 78-93, 2019 | 4 | 2019 |
Customer order scheduling with job-based processing and lot streaming in a two-machine flow shop FC Çetinkaya, GB Yozgat International Journal of Industrial Engineering & Production Research 33 (2 …, 2022 | 2 | 2022 |
İmalat kafilesi bölme ve aktarma problemleri üzerine literatür taraması ve potansiyel araştırma konuları FC Çetinkaya | 2 | 2008 |
Unrelated parallel machine scheduling under machine availability and eligibility constraints to minimize the makespan of non-resumable jobs A Kurt, FC Çetinkaya International Journal of Industrial Engineering and Management 15 (1), 18-33, 2024 | 1 | 2024 |
An integrated inventory and distribution planning problem for the blood products: An application for the Turkish Red Crescent A Kurt, M Azizoğlu, F Cetinkaya Decision Science Letters 12 (2), 315-332, 2023 | | 2023 |
A heuristic approach for profit-oriented disassembly scheduling problem M Kaya Akça, ZP Bayındır, FC Çetinkaya null, 2013 | | 2013 |
İngilizce Türkçe Endüstri mühendisliği ve mühendislik terimleri sözlüğü FC Çetinkaya TMMOB, 2009 | | 2009 |
Sector Selection for Cluster Formation at OSTİM Industrial Zone: An AHP Application FC Çetinkaya, L Kandiller, B Satır, M Umutlu | | 2009 |
TECHNICAL REPORT WRITING AND ORAL PRESENTATION FC Çetinkaya | | 1999 |
Lot scheduling with transfer batches in multi-stage shops FC Çetinkaya Middle East Technical University, 1996 | | 1996 |