关注
Erhan Kutanoglu
Erhan Kutanoglu
Operations Research and Industrial Engineering, The University of Texas at Austin
在 austin.utexas.edu 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Integrating preventive maintenance planning and production scheduling for a single machine
CR Cassady, E Kutanoglu
IEEE Transactions on reliability 54 (2), 304-309, 2005
3892005
Empty container management for intermodal transportation networks
ST Choong, MH Cole, E Kutanoglu
Transportation Research Part E: Logistics and Transportation Review 38 (6 …, 2002
3822002
On combinatorial auction and Lagrangean relaxation for distributed resource scheduling
E Kutanoglu, S David Wu
IIE transactions 31 (9), 813-826, 1999
2921999
Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
CR Cassady, E Kutanoglu
IIE transactions 35 (6), 503-513, 2003
2492003
Integrated inventory and transportation mode selection: A service parts logistics system
E Kutanoglu, D Lohiya
Transportation Research Part E: Logistics and Transportation Review 44 (5 …, 2008
1492008
An inventory sharing and allocation method for a multi-location service parts logistics network with time-based service levels
E Kutanoglu, M Mahajan
European Journal of Operational Research 194 (3), 728-742, 2009
1452009
Optimization and analysis of a robot-assisted last mile delivery system
MD Simoni, E Kutanoglu, CG Claudel
Transportation Research Part E: Logistics and Transportation Review 142, 102049, 2020
1412020
Benefits of considering inventory in service parts logistics network design problems with time-based service constraints
MF Candas, E Kutanoglu
IIE transactions 39 (2), 159-176, 2007
1222007
An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
E Kutanoglu, I Sabuncuoglu
International Journal of Production Research 37 (1), 165-187, 1999
1081999
Insights into inventory sharing in service parts logistics systems with time-based service levels
E Kutanoglu
Computers & Industrial Engineering 54 (3), 341-358, 2008
932008
Routing-based reactive scheduling policies for machine failures in dynamic job shops
E Kutanoglu, I Sabuncuoglu
International journal of production research 39 (14), 3141-3158, 2001
872001
Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop
E Kutanoglu, I Sabuncuoglu
Journal of Manufacturing Systems 20 (4), 264-279, 2001
822001
Quantifying the value of advance load information in truckload trucking
D Tjokroamidjojo, E Kutanoglu, GD Taylor
Transportation Research Part E: Logistics and Transportation Review 42 (4 …, 2006
812006
Urban consolidation solutions for parcel delivery considering location, fleet and route choice
MD Simoni, P Bujanovic, SD Boyles, E Kutanoglu
Case Studies on Transport Policy 6 (1), 112-124, 2018
802018
US electricity infrastructure of the future: Generation and transmission pathways through 2050
G Jayadev, BD Leibowicz, E Kutanoglu
Applied energy 260, 114267, 2020
782020
Lagrangian relaxation guided problem space search heuristics for generalized assignment problems
V Jeet, E Kutanoglu
European Journal of Operational Research 182 (3), 1039-1056, 2007
772007
The timeline and events of the february 2021 texas electric grid blackouts
CW King, JD Rhodes, J Zarnikau, N Lin, E Kutanoglu, B Leibowicz, ...
The University of Texas Energy Institute 2, 2021
702021
An approximate approach for the joint problem of level of repair analysis and spare parts stocking
RJI Basten, MC Van der Heijden, JMJ Schutten, E Kutanoglu
Annals of operations research 224, 121-145, 2015
522015
Logistics network design with inventory stocking for low-demand parts: Modeling and optimization
V Jeet, E Kutanoglu, A Partani
IIE Transactions 41 (5), 389-407, 2009
522009
Improving scheduling robustness via preprocessing and dynamic adaptation
E Kutanoglu, SD Wu
IIE transactions 36 (11), 1107-1124, 2004
48*2004
系统目前无法执行此操作,请稍后再试。
文章 1–20