Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes MG Ierapetritou, CA Floudas Industrial & engineering chemistry research 37 (11), 4341-4359, 1998 | 652 | 1998 |
Advances in surrogate based modeling, feasibility analysis, and optimization: A review A Bhosekar, M Ierapetritou Computers & Chemical Engineering 108, 250-267, 2018 | 629 | 2018 |
Process scheduling under uncertainty: Review and challenges Z Li, M Ierapetritou Computers & Chemical Engineering 32 (4-5), 715-727, 2008 | 497 | 2008 |
Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes MG Ierapetritou, CA Floudas Industrial & engineering chemistry research 37 (11), 4360-4374, 1998 | 314 | 1998 |
Novel approach for optimal process design under uncertainty EN Pistikopoulos, MG Ierapetritou Computers & chemical engineering 19 (10), 1089-1110, 1995 | 265 | 1995 |
A review of the Residence Time Distribution (RTD) applications in solid unit operations Y Gao, FJ Muzzio, MG Ierapetritou Powder technology 228, 416-423, 2012 | 256 | 2012 |
Characterizing continuous powder mixing using residence time distribution Y Gao, A Vanarase, F Muzzio, M Ierapetritou Chemical Engineering Science 66 (3), 417-425, 2011 | 234 | 2011 |
Efficient short-term scheduling of refinery operations based on a continuous time formulation Z Jia, M Ierapetritou Computers & chemical engineering 28 (6-7), 1001-1019, 2004 | 221 | 2004 |
Refinery short-term scheduling using continuous time formulation: Crude-oil operations Z Jia, M Ierapetritou, JD Kelly Industrial & engineering chemistry research 42 (13), 3085-3097, 2003 | 221 | 2003 |
An integrated approach for dynamic flowsheet modeling and sensitivity analysis of a continuous tablet manufacturing process: an integrated approach F Boukouvala, V Niotis, R Ramachandran, F Muzzio, MG Ierapetritou Computers & Chemical Engineering, 2012 | 209 | 2012 |
Global optimization in design under uncertainty: feasibility test and flexibility index problems CA Floudas, ZH Gümüş, MG Ierapetritou Industrial & Engineering Chemistry Research 40 (20), 4267-4282, 2001 | 189 | 2001 |
Comments on" An Improved RTN Continuous-Time Formulation for the Short-term Scheduling of Multipurpose Batch Plants" MG Ierapetritou, CA Floudas Industrial and Engineering Chemistry Research 40 (22), 5040-5041, 2001 | 188* | 2001 |
Petroleum refining operations: key issues, advances, and opportunities NK Shah, Z Li, MG Ierapetritou Industrial and Engineering Chemistry Research 50 (3), 1161, 2011 | 186 | 2011 |
The berth allocation problem: Optimizing vessel arrival time MM Golias, GK Saharidis, M Boile, S Theofanis, MG Ierapetritou Maritime Economics & Logistics 11, 358-377, 2009 | 179 | 2009 |
Resolution method for mixed integer bi-level linear problems based on decomposition technique GK Saharidis, MG Ierapetritou Journal of Global Optimization 44 (1), 29-51, 2009 | 177 | 2009 |
Perspectives on the continuous manufacturing of powder‐based pharmaceutical processes M Ierapetritou, F Muzzio, G Reklaitis AIChE Journal 62 (6), 1846-1862, 2016 | 176 | 2016 |
Characterization of continuous convective powder mixing processes PM Portillo, MG Ierapetritou, FJ Muzzio Powder Technology 182 (3), 368-378, 2008 | 168 | 2008 |
Digital twins in pharmaceutical and biopharmaceutical manufacturing: a literature review Y Chen, O Yang, C Sampat, P Bhalode, R Ramachandran, M Ierapetritou Processes 8 (9), 1088, 2020 | 159 | 2020 |
Optimal design of sustainable chemical processes and supply chains: A review A Nikolopoulou, MG Ierapetritou Computers & Chemical Engineering 44, 94-103, 2012 | 158 | 2012 |
Mixed-integer linear programming model for gasoline blending and distribution scheduling Z Jia, M Ierapetritou Industrial & Engineering Chemistry Research 42 (4), 825-835, 2003 | 157 | 2003 |